Skip to main content

Plastic injection molding, CEO, 100–500 and 500–1000, one site, system unknown

6 objections · Study only
Study only

Read this before you call. You are calling the CEO of a plastic injection molding company with one site and 100–500 or 500–1000 employees. You do not know their system yet. A company on your list is someone you may call. It does not mean they have the problem. Study the page. An open line is not something you say on the phone. After the call, coaching listens to the pushback and the handoff. How you sound is the company voice, under Sources.

01

Who to call

Book only when the bars below are true. The notes are who you call.

Book only when all three are true

A founder's 20 minutes go to companies we can help now. The prospect has to clear all three bars before you book the meeting.

  • They fit the defined audience.
  • They expect at least 10 seats.
  • They plan to buy an ERP within 180 days.

Reject, and do not recycle

Some prospects aren't a fit however the call goes. Rejecting them early keeps the founder's calendar for the ones who are.

  • They aren't planning to buy an ERP within 180 days.
  • They expect fewer than 10 seats.
  • Their industry doesn't match the defined audience.
  • They require ITAR or FedRAMP compliance.
  • They're a job shop.
Final

Close the prospect. No recycling and no further follow-up.

Market

Plastic injection molding (M1_V2).

Size

100–500 employees, then 500–1000.

Site

One site.

System

You do not know which system holds their records yet.

Ownership

Family owned or family controlled. Private, not public. Operating for more than three years.

Hiring

Hiring for order entry, accounts payable, or other clerical work. If you have not checked yet, they stay on the list.

Contact

The CEO (P1).

Before you dial

ZoomInfo can give you a company, a title, and a number. That is not evidence of the problem. Check the details that matter before you dial.

02

Who you are speaking to

Who is on the phone. A title is not the job unless we know the job.

Role

The CEO (P1). They carry direction, continuity, risk, and the decision to spend.

Titles

You may reach them as Chief Executive Officer, Owner, President, or General Manager. The title does not prove they own the problem or can sponsor the change.

Job

We do not know the job they are trying to get done. Do not invent it from the title.

03

Messaging

Six steps, in order. An empty step stays empty.

Six steps, in this order

Every outbound message follows the same order, so they confirm their reality before we offer anything.

  1. RealityThe buyer's own account, an artifact we can see, and our model of how their work runs. The buyer confirms it before we move on.
  2. Problem hypothesisThe operational mismatch, the evidence that would show it, and a question that lets the buyer confirm it. Tag its status as inferred, call_confirmed, or artifact_verified.
  3. Impact hypothesisThe loss, risk, or constraint, quantified. If we can't quantify it yet, label it as a hypothesis.
  4. MechanismHow it gets solved: a native capability, an adaptation in the builder, or an action by Logic Pilot.
  5. ProofA demo on the customer's data, a live build, a benchmark, or a reference.
  6. ChoiceAn explicit, low-pressure next step.
StepLine
RealityThe schedule shows the orders and the dates they are required, and the feasible placement still looks like it lives with a planner, line by line.
Problem hypothesisCan accepted orders at this one site run on several assets that differ in output and suitability, while a planner still builds the sequence by hand? Before we treat that as true, we would look at one scheduling cycle: the orders available, any placement the system generated, the planner's changes, and the constraints behind those changes.
Impact hypothesisIf orders with a required date sit unslotted until a planner places them, what changes in the week? We do not have a number for delivery, margin, changeover, utilization, freight, or output.
MechanismYour work-center output, availability, changeovers, minimum quantities, and calendar have to be set up for your plant before a generated placement is something to trust. We cannot size that work until we have seen the rules and records you already keep. The schedule we checked assumes the plant runs all day, every day. If you do not run that way, that schedule is outside what we have verified. With the data kept up, we can propose a compatible work center and planned dates when a manufacturing order is confirmed, and leave work already started fixed for a planner to review. We have not shown a best-possible sequence, and freight was not part of what we verified.
ProofWhat we can show is a planned-date change on one synthetic open work order that has not started. The new planned start falls on or after the manufacturing-order date, and the planned end is visible and not earlier than the start. That check does not show the first assignment of an order to a work center, and it is not a result from a customer’s plant.
ChoiceWe do not have this yet.
04

Talk track

The opening is set. The scene after it is for this call.

Opening

This is the opening, not the objection. Say who you are. Do not invent a title or a reason for the call.

  1. Say who you are, transparently.
  2. Ask a no-oriented time question: "Is now a bad time to talk?"
  3. Stop and listen.

After the time question

If you hearThen
No, it's not a bad time.The schedule shows the orders and the dates they are required, and the feasible placement still looks like it lives with a planner, line by line. That is our hypothesis, not a fact about you. Then one question: Would it be a bad idea to examine where the current system stops matching the work?
Yes, it's a bad time.Stop. Accept the callback they propose, or end the call. No pitch on the way out.
05

Cadence

A sequence appears only when we know the touches.

Not established

We do not have the touches, the channel, or the order. Do not invent the days, a touch count, a subject line, or an email.

06

Objection handling

Each row is one way to listen. A missing row stays missing.

Four moves

A row is a listening move tied to a source. It is not a rebuttal and not a stack of tools.

MoveWhat it does
DiscloseSay the limit in their words before you recommend anything. That includes setup they still have to do, a gap in what we can show, or something we have not shipped.
DropIf they describe the opposite, that theme is not theirs. Leave it. Do not steer back.
DeclineIf they ask you to say something we do not claim, do not soften it into a yes.
ListenIf they raise a competitor, or a constraint we already know, listen. Do not answer it with a feature.
Not a row

Send me an email, call me next quarter, and we already have a vendor are ways to end the call. They are not rows on this page.

Drop · Manual sequencing is already resolved

Need
They need to see it clearly.
They may say
The system already places the job. My planners look at the exceptions.
You say
It seems like the ordinary order already gets a feasible place, and your planners are looking at exceptions.
Then
Silence.
If they continue
Repeat back: "Feasible assignment."
Do not say
That manual scheduling causes late delivery or lost margin, that scheduling should run without planner review, or any changeover, utilization, freight, or output number.
Leave it when
They have described the opposite of this problem. Leave it.

Drop · Quoting already reads the asset

Need
They need to see it clearly.
They may say
When we quote, we already see which machine is free and how fast it runs.
You say
It seems like the quote already reads which asset is free and how fast it runs.
Then
Silence.
If they continue
Repeat back: "Asset availability."
Do not say
Any win-rate, margin, on-time, or changeover number; that you are delivering late or losing work on price; that scheduling is fully automatic; or that your quoting ignores capacity.
Leave it when
They have described the opposite of this problem. Leave it.

Drop · Batch size is already compared

Need
They need to see it clearly.
They may say
We already weigh how many to run against cost, scrap, demand, and what it costs to hold the extra.
You say
It seems like you already weigh quantity, cost, scrap, demand, and the cost of holding inventory before the job is released.
Then
Silence.
If they continue
Repeat back: "Carrying cost."
Do not say
That a quantity is optimal, that a larger batch lowers total cost, any saving or return figure, that AI or a dashboard can pick the quantity without complete data, or that the incumbent has no learning-curve function.
Leave it when
They have described the opposite of this problem. Leave it.

Drop · Quote intake is already structured

Need
They need to see it clearly.
They may say
A request already becomes a quote. Nobody retypes it.
You say
It seems like a request already becomes a quote record without someone retyping it.
Then
Silence.
If they continue
Repeat back: "Without rekeying."
Do not say
That manual intake causes errors, slow response, or lost quotes; that every request can be interpreted automatically; or any labor or response-time number.
Leave it when
They have described the opposite of this problem. Leave it.

Drop · Reports already come from the system

Need
They need to see it clearly.
They may say
The reports we rely on already come out of the system. We do not rebuild them in a spreadsheet.
You say
It seems like the reports you rely on already come from the operating system and stay tied to the transactions.
Then
Silence.
If they continue
Repeat back: "Without spreadsheet reconstruction."
Do not say
That a named ERP cannot report, that every company on a named ERP exports every report, any delay or error-rate number, or that a replacement removes all manual analysis.
Leave it when
They have described the opposite of this problem. Leave it.

Drop · Counts already reconcile

Need
They need to see it clearly.
They may say
A physical count already lands close enough, or the difference is timing we can name.
You say
It seems like a physical count already lands within the tolerance you agreed, or the difference traces to timing you can name.
Then
Silence.
If they continue
Repeat back: "Agreed tolerance."
Do not say
That the vendor or the code causes the variance before diagnosis, that employees are responsible, that the mismatch causes stockouts, delays, or financial loss, or that replacing the system makes inventory accurate.
Leave it when
They have described the opposite of this problem. Leave it.
07

Battle cards

One card per competitor on this list. A name here does not mean they use it.

DELMIAworks

If they raise DELMIAworks, use this card. Do not open by saying they use it. We do not know their system.

Strengths

Reviewers report ERP and shop-floor execution on one database, real-time production visibility, inventory and purchasing control, machine-level data from individual reviewers, molding depth from one 2020 G2 reviewer, support, and ongoing product development.

Limitations

Reviewers report a learning curve, demanding implementation, a dated interface in recent Capterra reviews, a hard upgrade path, report formatting and custom-report cost in older G2 reviews, value for money at 3.8 from 118 ratings, and fit for non-standard work from single reviewers. Visible G2 reviews date from 2019–2021. Many visible reviews were incentivized or vendor-invited.

Discovery

Only if they raise DELMIAworks: which shop-floor data is real-time, and which of it is typed; how updates are planned and tested; which reports are rebuilt or paid for; which processes differ from the standard path, and who changes them; how long a new planner takes to work without help; how planners see future supply and demand and trace a requirement to the order.

Do not claim

Do not say DELMIAworks is outdated, hard to use, unstable, or a poor fit for every plant. Do not turn one review into the rule. Do not say we are faster, easier, cheaper, more modern, easier to upgrade, or free of implementation work without a test on their work. Do not say we read machine signals. Do not say our equipment effectiveness, calculated from production reports, is the same as a measurement taken from the machine. Do not say a calculation stays quick at any volume without a test. Do not present setup work, a connection to another system, or something we have not shipped as something that is already there.

08

Qualification and handoff

Book only when the booking bars are met, and hand off with the record the founder reads.

What has to be true

TestOn this call
FitNot known for this company. A name on the list does not show they have the problem.
Material impactNot known for this company. We do not have a number for the loss, the risk, or the constraint.
SponsorNot known for this company. A title is not a sponsor.
Proof possibleNot known for this company. The checks we have are not a test on their plant.
Decision process knownNot known for this company.
Transition risk understoodNot known for this company.

Log before you hand off

The founder reads this record before reaching out and uses it to shape the demo. Every gap here becomes a question we spend the prep call on.

  • Decision-maker name and title
  • Company name, size, website, and industry
  • Expected seat count
  • Purchase timeline

A valid next step

  • Artifact
  • Buyer owner
  • Naologic owner
  • Due date
  • Meeting date
  • Acceptance criterion
Not established

A vague follow-up, a missing owner, or a missing date is not a handoff. “Book a meeting” is not a handoff.

Yes

A verbal yes is not adoption. Confirm how it will be done before you treat the call as booked.

09

Coaching handoff

Coaching scores the call against this page. It does not add a second script.

What the coach listens for

  • The time question ended the call when they said it was a bad time.
  • Each objection used one label, then silence, then at most one follow.
  • A drop stayed dropped.
  • A disclose came before a recommendation.
  • No prohibited line was said.
  • A yes was not treated as the handoff.
10

Before you dial

What you still need to know before you pick up the phone.

Before you dial

  • Study this page before you dial. If a line is open, you do not say it.
  • You do not know the job this CEO is trying to get done. Ask. Do not guess it from the title.
  • If they stay on the line, stay with one scene. The schedule shows the orders and the dates, and a planner still places the work by hand. Then ask the question in the talk track.
  • If they describe the opposite of that scene, leave it.
  • You do not have a follow-up sequence. Do not invent the days, the emails, or a subject line.
  • You do not have a next step yet. When you do, name what you will look at, who owns it with them, who owns it with us, when it is due, when you meet, and what done looks like.
  • Before you talk about a schedule, say the limit. We have not tested their plant.
  • Do not name their system. Do not give a number we do not have. The lines you must not say are under Do not claim.
11

Do not claim

Lines you do not say.

Standing tactics we never use

Names of the boundary, not lines to say. The long form is the prohibited tactics section.

  • Manufacture fear
  • Weaponize loss aversion
  • Use false deadlines
  • Use extreme anchors without basis
  • Frame compliance as fairness
  • Seek counterfeit agreement
  • Shame buyer responses
  • Conceal uncertainty
  • Pressure decisions
  • Apply pressure when you meet resistance

On this call

  • Do not say manual scheduling is why they are late or why margin is gone. Do not say the schedule should run without a planner. Do not give a changeover, utilization, freight, or output number.
  • Do not say they are late or losing work on price. Do not say quoting ignores capacity before they confirm it. Do not say scheduling is fully automatic, or that a person no longer sequences the work. Do not give a win-rate, margin, on-time, or changeover number.
  • Do not say a run quantity is the right one before history, demand, and the cost of holding inventory are in the comparison. Do not say a larger batch costs less overall. Do not say a dashboard can pick the quantity without complete, current data. Do not say their current system has no learning curve.
  • Do not say manual quote intake causes errors, a slow reply, or lost quotes. Do not say every request can be read automatically. Do not give a labor or response-time number.
  • Do not say a named system cannot report, or that every company on it exports every report. Do not say a replacement removes all manual analysis. Do not give a delay, labor, or error-rate number without their evidence.
  • Do not say the vendor, the code, or the employees caused an inventory difference before anyone has looked. Do not say the difference causes stockouts, delays, or financial loss without their evidence. Do not say a new system makes inventory accurate.
  • Do not say we found the best sequence, optimized freight, or offer preventive maintenance. Do not say every unslotted order gets a feasible place.
  • Do not offer raw-material planning, a zero-stock strategy, or leftover management. Do not mention personal patents. Do not carry extrusion changeover or run length into injection molding.
  • Do not say we calculate the cost of holding inventory, or that the quantity on hand is that cost. Do not say the cheapest past run is the right next quantity. Do not say the product picks or releases the quantity.
  • Do not say we handle every language, that a draft is correct without review, that the error rate is 5%, or that more than 100 quotes a day is proven. Do not say price or timing is instant, or that quotes go out faster without a measured baseline. Do not say judgment leaves custom quoting.
  • Do not say spreadsheets go away, that every report is already there, or that a report is right before it is checked against the transactions. Do not say the results stay current without running the view again.
  • Do not say we can find the first wrong inventory transaction, or that a count difference proves theft, waste, an employee error, or a software defect. Do not say an adjustment stops the next difference.
  • Do not say DELMIAworks is outdated, hard to use, unstable, or a poor fit for every plant. Do not turn one review into the rule. Do not say we are faster, easier, cheaper, more modern, or free of implementation work without a test on their work. Do not say we read machine signals, or that our equipment number is the machine’s number.
12

Sources

Where the lines on this page come from.

Standing sources

SourceWhat it governs here
Company voiceHow you sound. .agents/system-prompts/company-voice.md
Playbook instructionsMessage order, the call, questions, agreement, and prohibited tactics.
Playbook cheatsheetThe same rules, short enough to review before a conversation.
Sales process, bookingWho qualifies, who is rejected, and what the Salesforce record must hold.
Sales process, tech stackSalesforce, ConnectAndSell, ZoomInfo, Cal.com, and Zoom.

For this call

SourceWhat it supports
Plastic injection molding (M1_V2)Who you call, and the profile this page was written from.
CEO (P1)Who you ask for. We do not know the job they are trying to get done.
Company100–500 employees, then 500–1000. One site. The system is not known before the call. Family owned, private, operating more than three years, and hiring clerical roles.
SchedulingThe scene on the open. We do not have a question written for the CEO.
QuotingA hypothesis. Leave it if the quote already reads the machine.
Run quantityA hypothesis. The cost comparison is not the cost of holding inventory.
Quote intakeA hypothesis. Email and phone intake still needs their mail or a transcript.
ReportsA hypothesis. We have no checked example.
InventoryA hypothesis. A posted count does not show where the difference started.
DELMIAworksContext if they raise it. A name here does not mean they use it.