Skip to main content

TM_M1_V1-P1-A06 Telemarketing guide, multi-site plastic extrusion CEO

Generated guide. Not a source. It comes from the M1_V1-P1-A06 audience profile. If that profile changes, throw this guide away and build it again. Don't edit it in place.

Read this first​

  • NOTE: You're calling the CEO of a plastic extrusion company. The title may also say Owner, President or General Manager.
  • NOTE: These companies have two to twenty plants. They have one hundred to one thousand people.
  • NOTE: Your goal is one next step. That's a short call to look at one real example together.
  • NOTE: You ask questions. You don't pitch. Every topic here is a guess until the CEO tells you it's true.

Say these names right​

NameSay it like this
SAP[ESS-AY-PEE]. Say each letter on its own.
QuickBooks[KWIK-books]
DELMIAworks[DEL-mee-uh-works]
Acumatica[ack-yoo-MAT-ih-kuh]

Words we use​

  • NOTE: Use the same word for the same thing every time.
We sayWe mean
systemThe software that runs their orders, stock and production.
accountingWhere they keep their books.
plantOne of their sites.
profitWhat they make after costs. Finance calls it margin.
stockWhat they have on hand. Finance calls it inventory.
run sizeHow much of one product they make at one time.
quote requestA customer asking for a price on a custom order.

Before you dial​

  • NOTE: Check that the company makes plastic products by extrusion. A code on your list isn't enough. Look at what they actually make.
  • NOTE: Check that they have two to twenty plants. Check that they have one hundred to one thousand people.
  • NOTE: Don't add other filters. Don't skip a company because of its job ads, website or software.
  • NOTE: Don't guess which system they use. You'll ask on the call.
  • NOTE: Don't guess what the CEO cares about most. Let them tell you.

Step 1. Open the call​

  • SAY: Hi, this is ___ from Naologic.
  • SAY: Is now a bad time to talk?
  • NOTE: Stop and wait. Let them answer.

If they say it's a bad time

  • SAY: No problem. When would be a better time to call?
  • NOTE: Book the time they give you. If they don't give one, thank them and end the call. Don't pitch.

If they say it's fine

  • SAY: Thanks. I call leaders of plastic extrusion companies with more than one plant.
  • SAY: Would you mind if I ask a few short questions?
  • NOTE: "No, I don't mind" means go ahead.

If someone else picks up

  • SAY: Hi, this is ___ from Naologic. Could I speak with ___, please?
  • NOTE: If they ask why you're calling, say the next line.
  • SAY: I'd like to ask a few questions about how you run your plants.

Step 2. Learn how they run things today​

  • SAY: What system runs your orders and stock today?
  • NOTE: Wait for the full answer. Then ask the next question.
  • SAY: And what do you use for accounting?
  • NOTE: Listen for QuickBooks, SAP or software they built themselves. Many use more than one. Write down which system does what.
  • NOTE: Don't judge any system. Never call a system old, weak or bad.

Step 3. Pick one topic​

  • NOTE: Ask about one topic at a time. Start with topic A.
  • NOTE: If they say it's not a problem, believe them. Thank them and try the next topic.
  • NOTE: When they say yes to a topic, stay on it. Don't try more than three topics on one call.
  • NOTE: Use topics A, B and C on every call. Use D, E and F only if the CEO brings them up.
  • NOTE: Ask one question at a time. Listen. Then ask the next one.

Topic A. Profit for each plant​

  • SAY: How do you see profit for each plant today?
  • SAY: And how do you see profit on each product?
  • SAY: Do you work out costs in the same unit you sell in?

Listen for

  • NOTE: Plant results are built by hand, or not at all.
  • NOTE: Accounting sits in a different system from orders and production.
  • NOTE: They work out costs in one unit and sell in another.
  • NOTE: Nobody knows the scrap rate. Or scrap shows up only as a general cost.
  • NOTE: Finance wants "what if" numbers but can't make them.

It's not a problem if

  • NOTE: Plant results come out of the system on a schedule, with no hand work.
  • NOTE: They use profit on each product to set prices.
  • NOTE: Costs and sales use the same unit. Or the system converts it for them.
  • NOTE: Scrap is tied to the job or line that made it.
  • NOTE: One system already holds both orders and accounting.

If it's a problem

  • SAY: Can you think of one profit question your system couldn't answer?
  • SAY: What did your team do instead? About how long did it take?
  • NOTE: That one example is what we want. Go to step 4 and book the call.

If it's not a problem

  • SAY: Got it. It sounds like that works well for you.
  • NOTE: Move to topic B.

If they ask what we do

  • SAY: We keep quotes, orders, production and shipping in one system.
  • SAY: Then you can see profit for each plant and each product in one place.
  • SAY: We set up the cost unit and the sales unit on each product.
  • NOTE: Say the next line only if their accounting is in QuickBooks.
  • SAY: Your accounting stays in QuickBooks. We keep it in sync.
  • NOTE: If their accounting is in SAP or their own software, say this instead.
  • SAY: We'd need to check how we'd connect to your accounting.
  • SAY: One thing to know. Profit on each product is only as good as what the floor records.

Never say

  • NOTE: Never say their numbers or reports are wrong.
  • NOTE: Never say they lose money on any plant, line or product.
  • NOTE: Never promise a saving, a number or a time.
  • NOTE: Never say we replace their accounting. We don't have our own accounting or year-end close.
  • NOTE: Never say we connect to SAP for accounting. We haven't shown that.
  • NOTE: Never say we can quote in more than one currency or unit.

Topic B. Quote requests​

  • SAY: When a customer wants a custom quote, how does the request reach you?
  • SAY: What happens before someone can start pricing it?

Listen for

  • NOTE: Requests come in by email and by phone.
  • NOTE: There's no automatic way to bring requests in.
  • NOTE: Someone types up each request by hand before they check price and schedule.

It's not a problem if

  • NOTE: Customers fill in a form with required fields. The form creates the quote with no retyping.
  • NOTE: Email and phone requests reach quoting with no one retyping them.

If it's a problem

  • SAY: Could we look at a few recent requests together?
  • SAY: We'd like to see each step and how much staff time it took.
  • NOTE: Go to step 4 and book the call.

If it's not a problem

  • SAY: Got it. It sounds like that works well for you.
  • NOTE: Move to topic C.

If they ask what we do

  • SAY: We turn a quote request into a draft quote.
  • SAY: A person on your team checks the draft and fixes it. Then the system prices it.
  • SAY: One thing to know first. We'd need to check how your email and phone requests come in.
  • SAY: It doesn't work in every language. A person always checks each draft.
  • SAY: Prices and dates are only as good as the data behind them.
  • NOTE: Say these limits before they ask.

Never say

  • NOTE: Never say typing by hand causes errors, slow replies or lost quotes.
  • NOTE: Never say every request can be read without a person.
  • NOTE: Never say it works in every language.
  • NOTE: Never give an error rate or a time saving. Never promise a number of quotes per day.
  • NOTE: Never say a person no longer needs to check quotes.

Topic C. Changing systems​

  • SAY: What plans do you have for your main systems?
  • NOTE: If they plan to replace a system, ask the next two questions. If not, move on.
  • SAY: Have you tested getting all your data out of the old system?
  • SAY: If you have, did your orders, invoices and stock stay linked?

Listen for

  • NOTE: They aren't sure they own all their data, or can keep it.
  • NOTE: They think they can export to a spreadsheet file. They haven't tested it.
  • NOTE: Orders and accounting are tied together in the old system.
  • NOTE: No test shows that records stay linked after export.
  • NOTE: After a past switch, only part of their data came across.

It's not a problem if

  • NOTE: They've done a full test export. They loaded it somewhere else and checked counts and totals.
  • NOTE: Their contract gives them rights to their data. A supported export lets them get it without the old vendor.

If it's a problem

  • SAY: Could we go through the records you'd need to move?
  • SAY: Then we can look at a small test export together.
  • NOTE: Go to step 4 and book the call.

If it's not a problem

  • SAY: Got it. It sounds like you're well prepared.
  • NOTE: Go to step 4, or end the call politely.

If they ask what we do

  • SAY: Before you switch, we do a test move with part of your data.
  • SAY: Then we check the counts and totals against your old system.
  • SAY: You decide to switch only after that check.
  • SAY: One thing to know. We can only work with data you're able to export.
  • SAY: We'd also check which of your record types we can bring in.

Never say

  • NOTE: Never say a vendor locks them in or blocks their data.
  • NOTE: Never say data is lost for good.
  • NOTE: Never say a spreadsheet file keeps records linked.
  • NOTE: Never say we can move everything, or that nothing will be lost.
  • NOTE: Never give a timeline, a cost or a downtime figure.

Topic D. Reports rebuilt in Excel​

  • NOTE: Use this only if the CEO brings up reports or Excel. We have no proof for this topic yet. You can still ask for one example.
  • SAY: When you need a report for a decision, where does it come from?
  • SAY: How much of it gets rebuilt in Excel?

Listen for

  • NOTE: They can't get a list of top sellers from the system.
  • NOTE: Buying or supplier reports need an export, then spreadsheet work.
  • NOTE: They say every report depends on Excel.
  • NOTE: Reports get built outside the system that holds the orders.

It's not a problem if

  • NOTE: Their main reports come straight from the system. They have the filters and math they need.
  • NOTE: Those reports use current data and match the source records.

If it's a problem

  • SAY: Could you share one report your team rebuilds by hand?
  • SAY: We'd like to see each step it takes to build.
  • NOTE: Go to step 4 and book the call.

If they ask what we do

  • SAY: We set up the reports you use most inside the system.
  • SAY: You rerun them when you need fresh numbers.
  • SAY: Each report needs setting up and checking first.
  • SAY: Some one-off questions may still need a spreadsheet.

Never say

  • NOTE: Never say SAP or any other system can't do reports.
  • NOTE: Never say everyone on their system has to export reports.
  • NOTE: Never say Excel goes away.
  • NOTE: Never give a time, cost or error number.

Topic E. Stock counts that don't match​

  • NOTE: Use this only if the CEO brings up stock counts. We have no proof for plastic extrusion on this topic yet. You can still ask for one example.
  • SAY: When you count your stock, how close is it to the system?
  • SAY: When it's off, can you find where the difference came from?

Listen for

  • NOTE: Counts don't match what the system says.
  • NOTE: They say their counts can't be trusted.
  • NOTE: Staff talk about strange glitches when they update stock.
  • NOTE: No one can find which step caused a difference.

It's not a problem if

  • NOTE: Counts match the system within a range they've agreed on. That holds for raw material, work in progress and finished goods.
  • NOTE: Differences trace back to timing or entries still waiting. They clear up the normal way.

If it's a problem

  • SAY: Could you share one recent count with the system numbers beside it?
  • NOTE: Go to step 4 and book the call.

If they ask what we do

  • SAY: We compare your counts to the stock in the system.
  • SAY: Approved differences get posted as a change you can trace later.
  • SAY: It won't find the cause of differences from the past.

Never say

  • NOTE: Never say their system or vendor causes the differences.
  • NOTE: Never blame their staff.
  • NOTE: Never say the differences cause stockouts, delays or losses.
  • NOTE: Never say a new system makes stock counts right.

Topic F. How much to run​

  • NOTE: Use this only if the CEO brings up run sizes. We haven't tested if this topic fits companies like this one. Ask the first question before anything else.
  • SAY: Do you ever make very different amounts of the same product?
  • NOTE: If they say no, drop this topic.
  • SAY: How do you decide how much to run?

Listen for

  • NOTE: They ask if they should run a small amount or tens of thousands.
  • NOTE: Their system has a feature for this. They can't get the answer they need from it.
  • NOTE: Cost per piece changes a lot with run size.
  • NOTE: Expected scrap could change which run size they choose.
  • NOTE: Planners weigh run size against demand and the cost of holding extra stock.

It's not a problem if

  • NOTE: They already compare run sizes for their main products. They weigh cost per piece, scrap, demand and holding cost.
  • NOTE: They only make to firm orders. There's no run size to choose.

If it's a problem

  • SAY: Could we look at past jobs for one product made in different amounts?
  • NOTE: Go to step 4 and book the call.

If they ask what we do

  • SAY: We compare the cost of past jobs by run size.
  • SAY: You see planned and actual cost, with open orders and stock beside it.
  • SAY: It doesn't pick the amount. Your planners still decide.
  • SAY: It doesn't include the cost of holding extra stock.

Never say

  • NOTE: Never say any run size is the best one.
  • NOTE: Never say bigger runs always cost less.
  • NOTE: Never say we work out holding cost or pick the amount for them.
  • NOTE: Never say their system lacks a feature for this.
  • NOTE: Never promise a saving, less scrap or a return.

Step 4. Book the next step​

  • SAY: Would it be a bad idea to look at that example on a call?
  • NOTE: "No, not a bad idea" means yes. Book it now.
  • SAY: What would you need to see for that call to be useful?
  • NOTE: Before you hang up, get four things. Write each one down.
    • NOTE: The example they'll bring.
    • NOTE: Who brings it from their side.
    • NOTE: Who joins from our side.
    • NOTE: The date and time.
  • NOTE: "Let's talk again soon" isn't a next step.

Other good endings

  • NOTE: They send you to someone else. That's a good result.
  • SAY: Who looks after that day to day?
  • SAY: May I say you suggested I call them?
  • NOTE: They tell you it's not a problem. Write that down, thank them and end the call.
  • NOTE: They want to stop. Thank them and end the call.

Step 5. When they push back​

  • NOTE: Stay calm. A "no" is useful news, not a loss. Never push.

"We're happy with what we have."

  • SAY: That's good to hear. What works best for you today?
  • NOTE: If they're happy, believe them. Thank them and end the call.

"Send me an email."

  • SAY: Sure. What should it cover so it's useful to you?
  • NOTE: Write down the topic they name. Send only that.

"What does it cost?" or "How long does it take?"

  • SAY: I don't want to guess. It depends on what you need.
  • SAY: That's why we start with one real example.

"How much will we save?"

  • SAY: I can't give you a number. We'd test it on your own data first.

"Who else do you work with?"

  • SAY: I'd rather show you on your own example.
  • NOTE: Don't name customers. Don't share results from other companies.

"We use DELMIAworks." Or "We're looking at Acumatica."

  • NOTE: Write it down. Don't compare. Don't criticize it.
  • SAY: Thanks, that helps. What works well for you with it?
  • SAY: What would you change about it, if anything?

Never say, on any call​

  • NOTE: That they have any of these problems before they tell you so.
  • NOTE: That SAP or any other system can't do reports.
  • NOTE: That their accounting moves off QuickBooks. Or that we have our own accounting.
  • NOTE: That any vendor locks them in. Or that their data is lost for good.
  • NOTE: That their numbers are wrong. Or that any plant, line or product loses money.
  • NOTE: That a new system makes stock counts right.
  • NOTE: That we work out holding cost or the best run size.
  • NOTE: Any number for savings, profit, time, accuracy or speed.
  • NOTE: That a feature works with no setup when it needs setup or a connection.
  • NOTE: That a feature is coming. Talk only about what's available now.
  • NOTE: That they use or are looking at DELMIAworks or Acumatica, unless they say so.
  • NOTE: Never use pressure or fake deadlines.

For reviewers. Not for the call.​

  • NOTE: This guide is provisional. The audience profile says it isn't ready for a call sheet.
  • NOTE: Every topic is a market guess with no account evidence. That's why each one opens as a question.
  • NOTE: There's no market-persona binding for this vertical and the CEO. So the guide states no job for the CEO.
  • NOTE: There are no Q&A records. The openers come from each problem's hypothesis and the playbook's cold-call steps.

Topic order

  • NOTE: A, B and C reach a proof that lists plastic extrusion. A comes first because it needs more than one plant, and this audience always has that.
  • NOTE: D reaches no proof. E's only proof is for injection molding and can't transfer.
  • NOTE: F's own record says its fit outside a single-plant maker is untested. So it's ask-first and listen-only.

Trace

TopicProblemSolutionProofCaveat
AP_00002S_00002PF_MULTI_002Ledger sync is recorded for QuickBooks only. The proof doesn't cover QuickBooks sync.
BP_00007S_00006PF_MULTI_005Not yet run. Tests uploaded batches, not email or phone intake.
CP_00012S_00011PF_MULTI_007No measured values. Evidence is from single-site firms of 20 to 100 people.
DP_00010S_00009noneBlocked. S_00009 has no proof.
EP_00011S_00010none usable in M1_V1PF_M1_V2_001 is M1_V2 only, and transfer is prohibited.
FP_00013S_00012PF_MULTI_006Never run. Selection is untested here. No carrying-cost method exists.

Competitors

  • NOTE: The audience selects C_00002_DELMIAWORKS and C_00003_ACUMATICA. Neither is active, because no account evidence exists. The guide only tells the rep to log a mention and ask a neutral question.

Sources

  • NOTE: Built from M1_V1-P1-A06.md and its source M1_V1-P1-A06.yaml. The cold-call steps follow src/data/playbook.ts.
  • NOTE: Source version bae3973. Generated 2026-10-14.