TM_M1_V1-P1-A06 Telemarketing guide, multi-site plastic extrusion CEO
Generated guide. Not a source. It comes from the M1_V1-P1-A06 audience profile. If that profile changes, throw this guide away and build it again. Don't edit it in place.
Read this first
- NOTE: You're calling the CEO of a plastic extrusion company. The title may also say Owner, President or General Manager.
- NOTE: These companies have two to twenty plants. They have one hundred to one thousand people.
- NOTE: Your goal is one next step. That's a short call to look at one real example together.
- NOTE: You ask questions. You don't pitch. Every topic here is a guess until the CEO tells you it's true.
Say these names right
| Name | Say it like this |
|---|---|
| SAP | [ESS-AY-PEE]. Say each letter on its own. |
| QuickBooks | [KWIK-books] |
| DELMIAworks | [DEL-mee-uh-works] |
| Acumatica | [ack-yoo-MAT-ih-kuh] |
Words we use
- NOTE: Use the same word for the same thing every time.
| We say | We mean |
|---|---|
| system | The software that runs their orders, stock and production. |
| accounting | Where they keep their books. |
| plant | One of their sites. |
| profit | What they make after costs. Finance calls it margin. |
| stock | What they have on hand. Finance calls it inventory. |
| run size | How much of one product they make at one time. |
| quote request | A customer asking for a price on a custom order. |
Before you dial
- NOTE: Check that the company makes plastic products by extrusion. A code on your list isn't enough. Look at what they actually make.
- NOTE: Check that they have two to twenty plants. Check that they have one hundred to one thousand people.
- NOTE: Don't add other filters. Don't skip a company because of its job ads, website or software.
- NOTE: Don't guess which system they use. You'll ask on the call.
- NOTE: Don't guess what the CEO cares about most. Let them tell you.
Step 1. Open the call
- SAY: Hi, this is ___ from Naologic.
- SAY: Is now a bad time to talk?
- NOTE: Stop and wait. Let them answer.
If they say it's a bad time
- SAY: No problem. When would be a better time to call?
- NOTE: Book the time they give you. If they don't give one, thank them and end the call. Don't pitch.
If they say it's fine
- SAY: Thanks. I call leaders of plastic extrusion companies with more than one plant.
- SAY: Would you mind if I ask a few short questions?
- NOTE: "No, I don't mind" means go ahead.
If someone else picks up
- SAY: Hi, this is ___ from Naologic. Could I speak with ___, please?
- NOTE: If they ask why you're calling, say the next line.
- SAY: I'd like to ask a few questions about how you run your plants.
Step 2. Learn how they run things today
- SAY: What system runs your orders and stock today?
- NOTE: Wait for the full answer. Then ask the next question.
- SAY: And what do you use for accounting?
- NOTE: Listen for QuickBooks, SAP or software they built themselves. Many use more than one. Write down which system does what.
- NOTE: Don't judge any system. Never call a system old, weak or bad.
Step 3. Pick one topic
- NOTE: Ask about one topic at a time. Start with topic A.
- NOTE: If they say it's not a problem, believe them. Thank them and try the next topic.
- NOTE: When they say yes to a topic, stay on it. Don't try more than three topics on one call.
- NOTE: Use topics A, B and C on every call. Use D, E and F only if the CEO brings them up.
- NOTE: Ask one question at a time. Listen. Then ask the next one.
Topic A. Profit for each plant
- SAY: How do you see profit for each plant today?
- SAY: And how do you see profit on each product?
- SAY: Do you work out costs in the same unit you sell in?
Listen for
- NOTE: Plant results are built by hand, or not at all.
- NOTE: Accounting sits in a different system from orders and production.
- NOTE: They work out costs in one unit and sell in another.
- NOTE: Nobody knows the scrap rate. Or scrap shows up only as a general cost.
- NOTE: Finance wants "what if" numbers but can't make them.
It's not a problem if
- NOTE: Plant results come out of the system on a schedule, with no hand work.
- NOTE: They use profit on each product to set prices.
- NOTE: Costs and sales use the same unit. Or the system converts it for them.
- NOTE: Scrap is tied to the job or line that made it.
- NOTE: One system already holds both orders and accounting.
If it's a problem
- SAY: Can you think of one profit question your system couldn't answer?
- SAY: What did your team do instead? About how long did it take?
- NOTE: That one example is what we want. Go to step 4 and book the call.
If it's not a problem
- SAY: Got it. It sounds like that works well for you.
- NOTE: Move to topic B.
If they ask what we do
- SAY: We keep quotes, orders, production and shipping in one system.
- SAY: Then you can see profit for each plant and each product in one place.
- SAY: We set up the cost unit and the sales unit on each product.
- NOTE: Say the next line only if their accounting is in QuickBooks.
- SAY: Your accounting stays in QuickBooks. We keep it in sync.
- NOTE: If their accounting is in SAP or their own software, say this instead.
- SAY: We'd need to check how we'd connect to your accounting.
- SAY: One thing to know. Profit on each product is only as good as what the floor records.
Never say
- NOTE: Never say their numbers or reports are wrong.
- NOTE: Never say they lose money on any plant, line or product.
- NOTE: Never promise a saving, a number or a time.
- NOTE: Never say we replace their accounting. We don't have our own accounting or year-end close.
- NOTE: Never say we connect to SAP for accounting. We haven't shown that.
- NOTE: Never say we can quote in more than one currency or unit.
Topic B. Quote requests
- SAY: When a customer wants a custom quote, how does the request reach you?
- SAY: What happens before someone can start pricing it?
Listen for
- NOTE: Requests come in by email and by phone.
- NOTE: There's no automatic way to bring requests in.
- NOTE: Someone types up each request by hand before they check price and schedule.
It's not a problem if
- NOTE: Customers fill in a form with required fields. The form creates the quote with no retyping.
- NOTE: Email and phone requests reach quoting with no one retyping them.
If it's a problem
- SAY: Could we look at a few recent requests together?
- SAY: We'd like to see each step and how much staff time it took.
- NOTE: Go to step 4 and book the call.
If it's not a problem
- SAY: Got it. It sounds like that works well for you.
- NOTE: Move to topic C.
If they ask what we do
- SAY: We turn a quote request into a draft quote.
- SAY: A person on your team checks the draft and fixes it. Then the system prices it.
- SAY: One thing to know first. We'd need to check how your email and phone requests come in.
- SAY: It doesn't work in every language. A person always checks each draft.
- SAY: Prices and dates are only as good as the data behind them.
- NOTE: Say these limits before they ask.
Never say
- NOTE: Never say typing by hand causes errors, slow replies or lost quotes.
- NOTE: Never say every request can be read without a person.
- NOTE: Never say it works in every language.
- NOTE: Never give an error rate or a time saving. Never promise a number of quotes per day.
- NOTE: Never say a person no longer needs to check quotes.
Topic C. Changing systems
- SAY: What plans do you have for your main systems?
- NOTE: If they plan to replace a system, ask the next two questions. If not, move on.
- SAY: Have you tested getting all your data out of the old system?
- SAY: If you have, did your orders, invoices and stock stay linked?
Listen for
- NOTE: They aren't sure they own all their data, or can keep it.
- NOTE: They think they can export to a spreadsheet file. They haven't tested it.
- NOTE: Orders and accounting are tied together in the old system.
- NOTE: No test shows that records stay linked after export.
- NOTE: After a past switch, only part of their data came across.
It's not a problem if
- NOTE: They've done a full test export. They loaded it somewhere else and checked counts and totals.
- NOTE: Their contract gives them rights to their data. A supported export lets them get it without the old vendor.
If it's a problem
- SAY: Could we go through the records you'd need to move?
- SAY: Then we can look at a small test export together.
- NOTE: Go to step 4 and book the call.
If it's not a problem
- SAY: Got it. It sounds like you're well prepared.
- NOTE: Go to step 4, or end the call politely.
If they ask what we do
- SAY: Before you switch, we do a test move with part of your data.
- SAY: Then we check the counts and totals against your old system.
- SAY: You decide to switch only after that check.
- SAY: One thing to know. We can only work with data you're able to export.
- SAY: We'd also check which of your record types we can bring in.
Never say
- NOTE: Never say a vendor locks them in or blocks their data.
- NOTE: Never say data is lost for good.
- NOTE: Never say a spreadsheet file keeps records linked.
- NOTE: Never say we can move everything, or that nothing will be lost.
- NOTE: Never give a timeline, a cost or a downtime figure.
Topic D. Reports rebuilt in Excel
- NOTE: Use this only if the CEO brings up reports or Excel. We have no proof for this topic yet. You can still ask for one example.
- SAY: When you need a report for a decision, where does it come from?
- SAY: How much of it gets rebuilt in Excel?
Listen for
- NOTE: They can't get a list of top sellers from the system.
- NOTE: Buying or supplier reports need an export, then spreadsheet work.
- NOTE: They say every report depends on Excel.
- NOTE: Reports get built outside the system that holds the orders.
It's not a problem if
- NOTE: Their main reports come straight from the system. They have the filters and math they need.
- NOTE: Those reports use current data and match the source records.
If it's a problem
- SAY: Could you share one report your team rebuilds by hand?
- SAY: We'd like to see each step it takes to build.
- NOTE: Go to step 4 and book the call.
If they ask what we do
- SAY: We set up the reports you use most inside the system.
- SAY: You rerun them when you need fresh numbers.
- SAY: Each report needs setting up and checking first.
- SAY: Some one-off questions may still need a spreadsheet.
Never say
- NOTE: Never say SAP or any other system can't do reports.
- NOTE: Never say everyone on their system has to export reports.
- NOTE: Never say Excel goes away.
- NOTE: Never give a time, cost or error number.
Topic E. Stock counts that don't match
- NOTE: Use this only if the CEO brings up stock counts. We have no proof for plastic extrusion on this topic yet. You can still ask for one example.
- SAY: When you count your stock, how close is it to the system?
- SAY: When it's off, can you find where the difference came from?
Listen for
- NOTE: Counts don't match what the system says.
- NOTE: They say their counts can't be trusted.
- NOTE: Staff talk about strange glitches when they update stock.
- NOTE: No one can find which step caused a difference.
It's not a problem if
- NOTE: Counts match the system within a range they've agreed on. That holds for raw material, work in progress and finished goods.
- NOTE: Differences trace back to timing or entries still waiting. They clear up the normal way.
If it's a problem
- SAY: Could you share one recent count with the system numbers beside it?
- NOTE: Go to step 4 and book the call.
If they ask what we do
- SAY: We compare your counts to the stock in the system.
- SAY: Approved differences get posted as a change you can trace later.
- SAY: It won't find the cause of differences from the past.
Never say
- NOTE: Never say their system or vendor causes the differences.
- NOTE: Never blame their staff.
- NOTE: Never say the differences cause stockouts, delays or losses.
- NOTE: Never say a new system makes stock counts right.
Topic F. How much to run
- NOTE: Use this only if the CEO brings up run sizes. We haven't tested if this topic fits companies like this one. Ask the first question before anything else.
- SAY: Do you ever make very different amounts of the same product?
- NOTE: If they say no, drop this topic.
- SAY: How do you decide how much to run?
Listen for
- NOTE: They ask if they should run a small amount or tens of thousands.
- NOTE: Their system has a feature for this. They can't get the answer they need from it.
- NOTE: Cost per piece changes a lot with run size.
- NOTE: Expected scrap could change which run size they choose.
- NOTE: Planners weigh run size against demand and the cost of holding extra stock.
It's not a problem if
- NOTE: They already compare run sizes for their main products. They weigh cost per piece, scrap, demand and holding cost.
- NOTE: They only make to firm orders. There's no run size to choose.
If it's a problem
- SAY: Could we look at past jobs for one product made in different amounts?
- NOTE: Go to step 4 and book the call.
If they ask what we do
- SAY: We compare the cost of past jobs by run size.
- SAY: You see planned and actual cost, with open orders and stock beside it.
- SAY: It doesn't pick the amount. Your planners still decide.
- SAY: It doesn't include the cost of holding extra stock.
Never say
- NOTE: Never say any run size is the best one.
- NOTE: Never say bigger runs always cost less.
- NOTE: Never say we work out holding cost or pick the amount for them.
- NOTE: Never say their system lacks a feature for this.
- NOTE: Never promise a saving, less scrap or a return.
Step 4. Book the next step
- SAY: Would it be a bad idea to look at that example on a call?
- NOTE: "No, not a bad idea" means yes. Book it now.
- SAY: What would you need to see for that call to be useful?
- NOTE: Before you hang up, get four things. Write each one down.
- NOTE: The example they'll bring.
- NOTE: Who brings it from their side.
- NOTE: Who joins from our side.
- NOTE: The date and time.
- NOTE: "Let's talk again soon" isn't a next step.
Other good endings
- NOTE: They send you to someone else. That's a good result.
- SAY: Who looks after that day to day?
- SAY: May I say you suggested I call them?
- NOTE: They tell you it's not a problem. Write that down, thank them and end the call.
- NOTE: They want to stop. Thank them and end the call.
Step 5. When they push back
- NOTE: Stay calm. A "no" is useful news, not a loss. Never push.
"We're happy with what we have."
- SAY: That's good to hear. What works best for you today?
- NOTE: If they're happy, believe them. Thank them and end the call.
"Send me an email."
- SAY: Sure. What should it cover so it's useful to you?
- NOTE: Write down the topic they name. Send only that.
"What does it cost?" or "How long does it take?"
- SAY: I don't want to guess. It depends on what you need.
- SAY: That's why we start with one real example.
"How much will we save?"
- SAY: I can't give you a number. We'd test it on your own data first.
"Who else do you work with?"
- SAY: I'd rather show you on your own example.
- NOTE: Don't name customers. Don't share results from other companies.
"We use DELMIAworks." Or "We're looking at Acumatica."
- NOTE: Write it down. Don't compare. Don't criticize it.
- SAY: Thanks, that helps. What works well for you with it?
- SAY: What would you change about it, if anything?
Never say, on any call
- NOTE: That they have any of these problems before they tell you so.
- NOTE: That SAP or any other system can't do reports.
- NOTE: That their accounting moves off QuickBooks. Or that we have our own accounting.
- NOTE: That any vendor locks them in. Or that their data is lost for good.
- NOTE: That their numbers are wrong. Or that any plant, line or product loses money.
- NOTE: That a new system makes stock counts right.
- NOTE: That we work out holding cost or the best run size.
- NOTE: Any number for savings, profit, time, accuracy or speed.
- NOTE: That a feature works with no setup when it needs setup or a connection.
- NOTE: That a feature is coming. Talk only about what's available now.
- NOTE: That they use or are looking at DELMIAworks or Acumatica, unless they say so.
- NOTE: Never use pressure or fake deadlines.
For reviewers. Not for the call.
- NOTE: This guide is provisional. The audience profile says it isn't ready for a call sheet.
- NOTE: Every topic is a market guess with no account evidence. That's why each one opens as a question.
- NOTE: There's no market-persona binding for this vertical and the CEO. So the guide states no job for the CEO.
- NOTE: There are no Q&A records. The openers come from each problem's hypothesis and the playbook's cold-call steps.
Topic order
- NOTE: A, B and C reach a proof that lists plastic extrusion. A comes first because it needs more than one plant, and this audience always has that.
- NOTE: D reaches no proof. E's only proof is for injection molding and can't transfer.
- NOTE: F's own record says its fit outside a single-plant maker is untested. So it's ask-first and listen-only.
Trace
| Topic | Problem | Solution | Proof | Caveat |
|---|---|---|---|---|
| A | P_00002 | S_00002 | PF_MULTI_002 | Ledger sync is recorded for QuickBooks only. The proof doesn't cover QuickBooks sync. |
| B | P_00007 | S_00006 | PF_MULTI_005 | Not yet run. Tests uploaded batches, not email or phone intake. |
| C | P_00012 | S_00011 | PF_MULTI_007 | No measured values. Evidence is from single-site firms of 20 to 100 people. |
| D | P_00010 | S_00009 | none | Blocked. S_00009 has no proof. |
| E | P_00011 | S_00010 | none usable in M1_V1 | PF_M1_V2_001 is M1_V2 only, and transfer is prohibited. |
| F | P_00013 | S_00012 | PF_MULTI_006 | Never run. Selection is untested here. No carrying-cost method exists. |
Competitors
- NOTE: The audience selects
C_00002_DELMIAWORKSandC_00003_ACUMATICA. Neither is active, because no account evidence exists. The guide only tells the rep to log a mention and ask a neutral question.
Sources
- NOTE: Built from M1_V1-P1-A06.md and its
source M1_V1-P1-A06.yaml. The cold-call
steps follow
src/data/playbook.ts. - NOTE: Source version
bae3973. Generated 2026-10-14.