Skip to main content

M1_V2-P2-A01 — Plastic injection molding CFO, 100–500 and 500–1000 employees, single site

Audience summary​

This audience selects single-site plastic injection molding companies in the 100–500 and 500–1000 employee bands, approached through the CFO function. The system of record is unknown before outreach. Four company signals govern membership, in YAML order; six selected problems remain hypotheses to test.

The source configuration is approved. Use this guide for discovery preparation at that lifecycle level. Enrichment does not approve an audience or establish any account's problem, authority, incumbent, or outcome. Every selected problem is a market_hypothesis with evidence_ids: [].

W11 call-sheet generation is not eligible. The vertical admits P2, but there is no canonical market-persona binding and no YAML override. The first problem has no CFO question, the reporting chain has no proof, and the other proofs have coverage or execution limits detailed below. DELMIAworks is selected competitive context; selection establishes no account use or evaluation.

Definition tuple​

DimensionControlled valueResolved meaningSource
MarketM1Vertical core; active, priority 1, medium confidenceMarket catalog
VerticalM1_V2Plastic injection molding; active, priority 2, medium confidenceVertical catalog
PersonaP2CFO; financePersona catalog
Company size100_500, 500_1000100–500, then 500–1000 employees, preserving YAML orderVariables, company_size
Location footprintsingle_siteOne operating siteVariables, location_footprint
Systems of record[unknown]No system identity established as a pre-call factVariables, system_of_record

M1_V2 belongs to M1 and lists P2 among its admitted personas. Its scope is verified tooling- and specification-driven industrial injection molders. Verify the establishment's actual process; selling products made by a process does not place a distributor, fabricator, or assembler in that vertical. The vertical's evidence_ids: null means unknown.

[unknown] is the exclusive unknown system selection, already in catalog order. It does not mean no systems exist. Do not infer DELMIAworks or a spreadsheet incumbent from competitive selection, hiring, or reporting symptoms. size_band_basis and systems_of_record_basis are both null: no deliberate selection rationale is recorded.

Incoming proof transfer from extrusion is conditional: polymer material, configuration, quality, and traceability concepts may transfer; mold, press, cavity, cycle-time, setup, and molding-schedule behavior does not transfer from extrusion proof. The vertical requires testing one representative order through mold and press assignment, material issue, production, quality, and actual cost. All five reached proofs already list M1_V2, so they are directly in scope under their stored lists. That membership does not establish execution or broader coverage than each proof's evidence supports.

Pre-call selection predicate and rejected signals​

Resolve the tuple and then apply these entries in order. A known absent state fails each required_state: present entry. An unknown state uses the stored handling below. Every on_unknown_basis is default and agrees with signal detection; there is no audience override. All four signals are approved, collectable before outreach, and do not mirror CFO presence. Collection coverage is null for all four: unmeasured.

OrderSignalPolarityRequired stateOn unknownGate effect or selection effect
1SG_001 — Family owned or family controlledgatingpresentexcludeAdmit only after ownership is resolved; owner-risk and step-change framing remains a hypothesis, with no qualifying outcome proved by selection.
2SG_024 — Privately owned rather than publicly tradedgatingpresentexcludeAdmit only after private ownership is resolved; do not apply private-company framing when absent.
3SG_025 — Operating for more than three yearsgatingpresentexcludeExclude greenfield companies under the catalog's accumulated-operating-record motion.
4SG_017 — Actively hiring back office clerical rolesqualifyingpresentincludeKnown absence fails; unchecked hiring remains in the candidate set. Hiring does not establish a selected problem or labor saving.

Meaning and inference provenance come from signals.yaml. The table defines audience selection, not the measured state of any account.

Collect the selected signals​

SignalObservable and collection sourcesRefreshCost
SG_001Derive from surname clustering and company/leader name overlap; confirm with ownership language on the about or history page. Sources: LinkedIn people, company website. A surname alone is insufficient.90 dayslow
SG_024Check registrant records, ticker, and investor relations. A privately held subsidiary of a publicly traded parent makes the signal absent. Sources: public filings, company website, LinkedIn company.180 dayslow
SG_025Compare founded year or incorporation date with the enrichment date; prefer incorporation when they disagree, while checking whether rebranding or re-registration understates operating age. Sources: LinkedIn company, company website, public filings.365 dayslow
SG_017Open job postings describe manual entry, reconciliation, or order processing as the primary duty. Source: job postings.7 daysmedium

These rules come from signal-detection.yaml.

Keep the interpretation as a hypothesis​

These are questions derived from the selected signals' stored interpretations, not account facts or new selection rules:

  • SG_001, founder_instinct, medium confidence: Does the owner carry the change personally, and would the proposed upside need to be roughly five times its cost? The numerical bar is a founder hypothesis, never a promised result or a confirmed buyer threshold.
  • SG_024, founder_instinct, high confidence: Is the decision judged on internal payback and owner or sponsor authority? What reporting or audit obligations actually apply? Private ownership does not establish that no external reporting deadline or audit exists.
  • SG_025, founder_instinct, medium confidence: Has the operating record outgrown its current system, leaving records or processes to migrate? Age alone does not confirm system debt or a displacement need.
  • SG_017, ai_inferred, medium confidence: Does clerical hiring represent buying more manual capacity, and what work and posted salary does the role cover? Hiring does not prove workload growth, a particular mismatch, or an achievable saving.

The family-owner gate calls for step-change proof. None of the selected chains establishes a five-times outcome; keep that unmet framing bar visible.

Rejected signals​

The reasons below are the YAML's stored decisions, preserved in order.

SignalCanonical meaning and polarityStored reason
SG_002Multiple employees share a last name; contextualContextual input to SG_001. Call-sheet collection context.
SG_003Company name matches a leader name; contextualContextual input to SG_001. Call-sheet framing.
SG_015Website looks current and maintained; contextualContextual card-layer signal. A dated site does not decide membership.
SG_019Median employee tenure over seven years; gatingEligible gating signal available before outreach. Left out because the predicate already holds the four higher-importance eligible signals.

All four rejected references resolve in the signal and detection catalogs. The first two remain inputs to ownership detection, without becoming independent membership tests. A website impression and tenure do not add gates. Rejected signal interpretations do not establish identity risk, change appetite, or resistance at an account.

First-call discovery plan​

discovery_plan: null means no audience-specific plan was supplied. The questions below are the existing selected problems' cfo_questions, in YAML problem order and canonical question order. Each starts at unknown; a conversation may confirm or disconfirm a problem without changing the pre-call definition tuple.

ProblemStarting stateCanonical CFO questions
P_00006unknownNo cfo_questions exists; confirmation_questions is empty. A generator must not invent a question.
P_00003unknownHow do you compare the margin you quoted with the line that actually ran the job?
P_00013unknownWhen a run would make more than current demand, how does the cost of holding the extra inventory enter the decision?
P_00007unknownWhat does one quote request take, in people and time, before it is a record you can price?
P_00010unknownHow do you produce a purchasing or inventory analysis from the transactions? Then: When a report has been prepared, how do you tie it back to the transactions in the operating system?
P_00011unknownWhen the book quantity and a physical count differ, how do you find the transactions that explain the difference? Then: How does an inventory difference show up in the figures you report?

Use the evidence requirements and disconfirming signals under each problem to judge the answer. This is a discovery reference, not a generated call sheet or an instruction to stack all six problems into one opener.

Market-persona context and primary-job hypothesis​

The persona catalog defines P2 as CFO, finance: financial stewardship, controls, reporting, cash, and credibility of financial decisions. Its common contact titles are Chief Financial Officer, Controller, Comptroller, Vice President of Finance, and Finance Director. Those titles support matching; they establish no opportunity authority or problem ownership.

The vertical catalog admits P2 but explicitly supplies no market-persona bindings. No canonical market_persona_catalog record was found in the sales library. The schema example in the asset format is not a binding. The YAML's market_persona: null provides no deliberate override.

Binding-derived fieldResolved value
Injection-molding role labelsunknown
Expected transaction rolesunknown
Responsibility hypothesis and statement typeunknown
Primary job or primary-job hypothesisunknown

No primary-job hypothesis is supplied by either source. Leave it unknown; do not infer a job, economic-buyer role, or decision-maker role from CFO. The canonical CFO questions above remain available without filling that gap.

Selected problems​

The sequence below is the YAML's order, not a sort by canonical priority. Every problem and reached solution is approved; all five reached proofs are also approved. These lifecycle states do not remove evidence, execution, configuration, or coverage limits. All six problems have empty evidence_ids and empty confirmation_questions.

YAML orderProblemCanonical priorityOrdered solution → proofCFO questions
1P_0000645S_00005 → PF_MULTI_0030
2P_0000355S_00003 → PF_MULTI_0021
3P_0001350S_00012 → PF_MULTI_0061
4P_0000745S_00006 → PF_MULTI_0051
5P_0001050S_00009 → none selected2
6P_0001145S_00010 → PF_M1_V2_0012

The situations do not contradict a single site or either selected size band, and none requires a named incumbent. They remain unconfirmed conditions: multiple assets may exist within one site, but the tuple does not establish asset differences, quoting volume, economic batch choices, spreadsheet reconstruction, or inventory variances. Single-site scope does not authorize per-site consolidation or profit framing.

1. P_00006 — Committed orders are sequenced through manual asset-by-asset judgment​

Source: P_00006. Canonical priority: 45. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Do accepted orders require a planner to choose and sequence among assets with different output or suitability, rather than reviewing exceptions to a feasible system-generated arrangement?

Tuple check: Multiple assets within one site can satisfy the situation; multiple sites are not required. The tuple does not establish asset diversity or a manual scheduling process.

Finance framing: No canonical CFO framing question is available. Do not assert lost margin or a finance responsibility from manual scheduling.

Canonical CFO questions:

No CFO question is supplied. This is a question-authoring blocker, not a slot to fill during enrichment.

Observable signals to look for; none is assumed present:

  • Scheduling is described as Tetris, manual slotting, or fitting orders into gaps.
  • A planner reviews several eligible assets before placing an order.
  • Orders with required dates remain unslotted in the scheduling view.
  • Changeover reduction and keeping similar work running are manual scheduling objectives.

Disconfirming signals:

  • The scheduling system produces a feasible asset and sequence assignment using maintained rates, capabilities, due dates, and changeover rules.
  • Planners review recorded exceptions rather than manually placing the ordinary order population.

Evidence needed to test the problem: One representative scheduling cycle showing the orders available, the initial system-generated allocation if any, the planner's manual changes, and which constraints drove those changes.

Ordered downstream chain: S_00005 — Generated work-center allocation and schedule reflow (approved) → PF_MULTI_003 (approved, directly listed for M1_V2).

Stored solution mechanism, subject to its conditions and proof limits: When a manufacturing order is confirmed, generate its dependent work orders, assign them to compatible work centers using maintained capacity, load, and performance information, and calculate their planned dates. Present that arrangement on the work-order timeline and allow the remaining active schedule to be reflowed after conditions change, while preserving work that has already started for planner review rather than rebuilding every placement manually.

Capability in the solution recordClassificationRequired conditions
Generate routed work orders with recorded dependencies when a manufacturing order is confirmednativeThe manufacturing order must have a valid routing and bill of materials. The manufacturing order must be eligible for confirmation under the configured work-in-progress policy. Evidence: none attached to this capability.
Assign compatible work centers using capacity, availability, and load-balanced scoringnativeCompatible work centers, sites, routing eligibility, and production characteristics must be maintained. Assignments are only as reliable as the current work-center and active-work-order data. Evidence: none attached to this capability.
Forward-schedule and reflow active work orders using dates, dependencies, capacity, and recorded blocked periodsnativeWork-center calendars and blocked periods must be recorded correctly. Work orders that have already started remain fixed rather than being rescheduled. Only forward scheduling was verified in MCP server d8189168. Evidence: none attached to this capability.
Review work-center assignments and planned dates on the work-order timelinenativeThe generated arrangement remains subject to planner review and correction. Evidence: none attached to this capability.
Configure work-center output, availability, changeovers, minimum quantities, sites, and warehousesconfiguredThe customer must define and maintain its production constraints and operating parameters. Configuration and data-migration effort cannot be sized before the existing rules and records are inspected. Evidence: none attached to this capability.

Proof readiness and boundaries: PF_MULTI_003 supports explicit reflow of one open, dependency-free work order against its parent manufacturing-order date. It does not prove initial generation, compatible assignment, load balancing, started-work preservation, dependency correctness, or a feasible placement for every order. The hardcoded 24/7 calendar needs separate shift validation. EV_PRODUCT_005 grounds structure; EV_MULTI_005 reports buyer use and acceptance without inspected before-and-after artifacts, exact dates, or per-vertical counts.

Acceptance criterion for a future representative test; not a reported result: For the representative synthetic schedule, Reflow Work Orders completes; the eligible open work order's resulting plannedStartDate differs from its before value and is on or after the linked manufacturing order's future manufacturingOrderDate; its plannedEndDate is visible and is not earlier than its plannedStartDate; and the buyer confirms that the resulting reflow is correctly set.

Proof evidence: EV_PRODUCT_005, EV_MULTI_005.

Solution limitations:

  • The confirmation-hook documentation identifies a hardcoded 24/7 scheduling assumption. Multi-shift and non-continuous calendar behavior must be verified before relying on the initial schedule.
  • The implementation demonstrates forward scheduling and load-balanced scoring, not proof of a globally optimal production sequence.
  • Site and warehouse relationships are represented, but freight cost, delivery routing, and transportation constraints were not verified as scheduling objectives.
  • Scheduling around recorded maintenance windows does not establish a preventive or predictive maintenance capability.
  • Incorrect routing, output, capacity, changeover, calendar, or required-date data can produce an unsuitable schedule.
  • Work already in progress is preserved and may constrain the recalculated arrangement.

Do not assert — canonical problem and solution restrictions:

  • That manual scheduling necessarily causes late delivery or lost margin.
  • That production scheduling can or should operate without planner review.
  • Any quantified changeover, utilization, freight, or output improvement.
  • That production scheduling operates without planner review.
  • That the generated sequence is globally optimal.
  • That the mechanism optimizes freight or transportation cost.
  • That it provides preventive or predictive maintenance.
  • That every unslotted order will receive a feasible placement.
  • Any quantified changeover, utilization, freight, output, margin, or delivery improvement.

2. P_00003 — Price and delivery date are committed without confirming the producing asset​

Source: P_00003. Canonical priority: 55. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Are price and delivery commitments made from general product rules while asset availability and output rate sit in a separate schedule?

Tuple check: Different assets can operate within the selected single site. Confirm that their output rates differ and that quoting and capacity are separate; neither is implied by injection molding.

Finance framing: Use the canonical question about quoted margin and the line that actually ran the job. Do not assert that quoting ignores capacity before confirmation.

Canonical CFO questions:

  • How do you compare the margin you quoted with the line that actually ran the job?

Observable signals to look for; none is assumed present:

  • A suggested-price rule set exists and the company states it does not read asset availability.
  • Scheduling is described as manual slotting, sequencing, or fitting work in.
  • A lead time is quoted from a look at the schedule rather than from a reservation against it.
  • Certain assets are described as running certain work better, faster, or cheaper.
  • Changeover reduction is described as a scheduling goal pursued by hand.

Disconfirming signals:

  • Quoting reads asset availability and output rate at the time the quote is made.
  • Quoted margin and realised margin are compared per order as a routine practice.
  • All assets are interchangeable in rate and capability, so which one runs the work does not change the cost.
  • Capacity is not the binding constraint, because the company quotes lead times long enough to absorb any sequence.

Evidence needed to test the problem: One quote where the promised date or the assumed output rate did not match the asset the work actually ran on, and what the company did about it.

Ordered downstream chain: S_00003 — Quoting bound to the production schedule (approved) → PF_MULTI_002 (approved, directly listed for M1_V2).

Stored solution mechanism, subject to its conditions and proof limits: Compute the suggested price and the promised date against a specific asset slot in the same schedule that holds availability and output rate, so the commercial commitment and the capacity record are one decision rather than two. The rule set that adjusts price by size, weight, and volume keeps running, but it reads the schedule instead of assuming it.

Capability in the solution recordClassificationRequired conditions
Rule-based quoting with product definition, accounts, quote delivery, acceptance, and sales attributionnativeThe customer states its pricing rules. Evidence: none attached to this capability.
Production schedule with bills of material, work orders, allocations, and production lines or locationsnativePer-asset output rates have to be entered and maintained. Evidence: none attached to this capability.
Binding the account's quoting rules to asset availability and output rateconfiguredThe customer states the per-asset rules, including which assets run which work well. Requires the schedule to be current, which makes it dependent on scheduling discipline. Evidence: EV_MULTI_004.
Forecasting engine with seasonality and risk exposure, for price, production, and timeconfiguredConfigured to the customer's data model. Seasonality requires historic data. Accuracy without it is not established. Evidence: none attached to this capability.
Raw material planning, zero-stock strategy, and leftover managementroadmapSeller described this as a next step once data is in the system, not as current behaviour. No release date was given. Evidence: none attached to this capability.
Preventive and predictive maintenanceunavailableSeller stated no module exists. The seller''s personal patents in predictive maintenance are individual background and must never be presented as product capability. Evidence: none attached to this capability.

Proof readiness and boundaries: PF_MULTI_002 covers pre-commit compatible-work-center plans and subsequent planned-versus-actual production margin. Capacity analysis does not reserve a production slot or establish material feasibility. Its two-work-center/warehouse fixture needs an applicable representative setup; no cross-site result is inferred. The 24/7 planning-calendar gap, maintained-rate requirements, complete production capture, and configured finance views remain. EV_PRODUCT_002 grounds costing mechanics; EV_MULTI_003 and EV_MULTI_004 supply bounded observations, without customer artifacts, exact account descriptions, or exact dates. The proof does not carry extrusion changeover or run-length behavior into molding. The solution description is broader than the demonstrated slot-planning behavior; do not strengthen the proof to match it.

Acceptance criterion for a future representative test; not a reported result: Before either representative record is committed, the calculation displays every compatible work center returned for its line and each displayed plan includes its associated forecast time, planned cost, delivery timing, and percentage margin. After the records proceed through different compatible work centers and their production reports and time tickets are completed, each record has a visible actual per-unit cost and the final comparison distinguishes planned and actual results by the linked warehouse and work center.

Proof evidence: EV_PRODUCT_002, EV_MULTI_003, EV_MULTI_004.

Solution limitations:

  • No maintenance capability of any kind, so asset availability does not account for planned downtime.
  • Material planning is not available today, so a slot can be confirmed that material cannot supply.
  • Output depends on per-asset rates being maintained. Stale rates produce confident, wrong answers.
  • Sequencing judgement is supported, not replaced.

Do not assert — canonical problem and solution restrictions:

  • Any quantified improvement in win rate, margin, on-time delivery, or changeover count.
  • That the company is currently delivering late or losing work on price.
  • That scheduling can be fully automated, or that human sequencing judgement is removed.
  • That the account''s quoting ignores capacity. Until the account confirms it, this is the hypothesis under test.
  • Any preventive or predictive maintenance capability, and any association of the seller's patents with the product.
  • That raw material planning, zero-stock, or leftover management is available.
  • That scheduling becomes automatic or that human sequencing is removed.
  • Any extrusion changeover or run-length behaviour when selling into M1_V2. Moulding setup, cavity, and cycle-time behaviour is different and the transfer rule prohibits carrying it.

3. P_00013 — Production quantity cannot be selected from total economic cost​

Source: P_00013. Canonical priority: 50. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Does a material choice of run quantity change production cost or scrap while output beyond demand carries inventory cost, without a usable combined economic comparison?

Tuple check: Single-site operation is compatible. Quantity-dependent cost, excess inventory, and carrying-cost exposure still require confirmation. The originating observation concerned finished goods and machined parts, so applicability to this molding segment remains an unevidenced hypothesis.

Finance framing: Use the canonical CFO question about the cost of holding extra inventory. No preferred batch size or economic optimum has been established.

Canonical CFO questions:

  • When a run would make more than current demand, how does the cost of holding the extra inventory enter the decision?

Observable signals to look for; none is assumed present:

  • The company asks whether it should run a small quantity or tens of thousands of the same item.
  • The incumbent offers learning-curve functionality, but the team says it cannot make the function produce the required decision.
  • Per-unit production cost changes materially with run quantity.
  • Expected scrap is described as capable of changing the preferred run quantity.
  • Planners need to compare candidate run quantities with demand and the cost of holding excess finished inventory.

Disconfirming signals:

  • For representative items and work centers, the company maintains a batch-size comparison that combines run quantity, per-unit production cost, expected scrap, demand, and inventory carrying cost.
  • Planning records show that selected quantities are routinely evaluated against that comparison and that realized production cost, scrap, inventory held, and demand consumption reconcile within agreed tolerances.
  • The company produces only against firm demand in quantities that create no material batch-size choice or inventory carrying-cost exposure.

Evidence needed to test the problem: Completed manufacturing-order history for representative items and work centers, including run quantity, material and conversion cost, produced quantity, scrap quantity and cost; the demand and finished-inventory position available when each quantity was selected; the company's inventory carrying-cost method; and the selected quantity's realized production, inventory, and demand-consumption result.

Ordered downstream chain: S_00012 — Reviewed production-cost comparison by order quantity (approved) → PF_MULTI_006 (approved, directly listed for M1_V2).

Stored solution mechanism, subject to its conditions and proof limits: Use each manufacturing order's ordered quantity, completed quantity, planned cost, and actual cost to compare historical production economics across representative run quantities for the same item and comparable work-center conditions. Present confirmed sales-order demand and current stock quantities as operating context, without treating them as expected stock value. If the customer later supplies and approves a separate expected-stock valuation and inventory carrying-cost method, configure that calculation as an explicitly customer-supplied extension. Until that extension exists, the mechanism is a production-cost comparison only and does not establish the total economic cost or preferred batch size.

Capability in the solution recordClassificationRequired conditions
Record planned and actual cost on each manufacturing ordernativeThe manufacturing order must contain the correct ordered and completed quantities. Production reports, work orders, time tickets, material consumption, labor, and scrap must be recorded completely. The configured manufacturing costing strategy must be applied consistently across compared orders. Planned and actual costs must use compatible units and currency. Evidence: none attached to this capability.
Compare historical manufacturing-order cost by run quantityconfiguredThe customer must define which items, variants, work centers, routings, and periods are comparable. The comparison must retain ordered quantity, completed quantity, planned total and per-unit cost, and actual total and per-unit cost. Changes in material, labor, routing, equipment, costing strategy, and product specification must be identified before orders are compared. The configured view must reconcile its totals to representative manufacturing orders. Configuration and testing effort cannot be sized before representative order history is inspected. Evidence: none attached to this capability.
Read confirmed sales-order demand and current stock quantity as contextnativeSales orders and stock records must be current and use compatible item and unit identifiers. Only confirmed sales-order demand is verified as a native demand source. On-hand and available stock are current quantities; neither is expected stock value. Demand and stock quantities must not be converted into economic cost without a separately approved method. Evidence: none attached to this capability.
Derive an expected scrap assumption for a candidate quantityconfiguredThe customer must define how completed-order scrap history is converted into an expected value. The customer must define the minimum representative history and treatment of outliers or changed operating conditions. No native expected-scrap model was verified. Configuration and testing effort cannot be sized before representative manufacturing history is inspected. Evidence: none attached to this capability.
Product-native expected-stock valuation and inventory carrying-cost calculationunavailableThe user explicitly stated that expected stock value and cost of carrying do not exist. No dedicated expected-stock valuation or inventory carrying-cost implementation was verified in MCP server d8189168. This capability must not be presented as shipped, configured, or on the roadmap. Evidence: none attached to this capability.
Apply a customer-supplied expected-stock valuation and inventory carrying-cost calculationconfiguredThe customer must supply and approve the expected-stock calculation. The customer must supply and approve the inventory valuation basis, carrying-cost method, rate, and time horizon. The source records and fields required by the customer calculation must be identified and maintained. No expected-stock or carrying-cost inputs were supplied for this record, so this capability is currently blocked. The configured result must be reconciled to representative historical periods before operational use. Configuration and testing effort cannot be sized before the customer method and source data are inspected. Evidence: none attached to this capability.
Present a reviewed production-quantity comparison before releaseconfiguredA configured view must expose the source manufacturing orders, quantities, planned costs, actual costs, variances, and assumptions. A planner must review the comparison before using it in a production-quantity decision. Without the customer-supplied expected-stock and carrying-cost extension, the view must be labeled production-cost comparison rather than total-economic-cost comparison. No dedicated native batch-size comparison or release gate was verified. Configuration and testing effort cannot be sized before the review workflow is inspected. Evidence: none attached to this capability.

Proof readiness and boundaries: PF_MULTI_006 defines a production-cost comparison of completed orders, not total economic cost. It has never been executed. Its declared context is a single-site industrial manufacturer of 20 to 100 employees; it does not establish coverage of this audience’s 100–500 and 500–1000 bands. Both evidence records are product-surface observations with no vertical scope; the seven-vertical listing is a stored authoring decision, not evidence of execution in each vertical. Fix a window of at least six months, unchanged module-level costing strategy, comparable orders, order-count minimum, quantity factor, tolerance, and planner acceptance before testing. Confirm the pivot column against ordered quantity. Expected-stock valuation and inventory carrying cost are unavailable natively, and the customer method and inputs for an extension have not been supplied. The proof also flags the solution’s wording about a confirmed sales-order status: confirmation is not a literal sales/order status value. Correct that source wording through record maintenance; do not silently repair it here.

Acceptance criterion for a future representative test; not a reported result: For the declared item and work site, over a buyer-declared window of at least six months of completed manufacturing orders during which the module-level manufacturing costing strategy was unchanged, the comparison contains at least two completed orders whose ordered quantities differ by at least a buyer-declared factor; every inspected row's planned cost, total cost, and cost per unit reconciles to its source manufacturing order within a buyer-declared tolerance; recalculating manufacturing-order cost reproduces the same values; and a named planner confirms in writing that the comparison is sufficient to be one input to a production-quantity decision. The criterion is not met if the comparison is presented as identifying the preferred or optimal batch size, or as a total economic cost.

Proof evidence: EV_PRODUCT_002, EV_PRODUCT_006.

Solution limitations:

  • The native product records planned and actual manufacturing-order cost but does not provide expected stock value or inventory carrying cost.
  • Without expected-stock valuation and carrying cost, the mechanism does not calculate the total economic cost required by P_00013.
  • Current on-hand or available stock quantity is not expected stock value and must not be used as a substitute.
  • Historical planned and actual cost relationships may not predict a future run after changes in material, labor, routing, equipment, costing strategy, or product specification.
  • Actual scrap history does not establish expected scrap for a candidate quantity without a customer-approved method.
  • A customer-supplied economic-cost extension is not currently available because its method and inputs have not been supplied.
  • The configured extension's implementation effort and accuracy cannot be established before the customer method and source data are inspected.
  • This mechanism does not optimize the production queue, automatically select a batch size, or replace planner judgment.

Do not assert — canonical problem and solution restrictions:

  • That any particular production quantity is optimal before the relevant history, demand, and carrying cost are evaluated.
  • That a larger batch necessarily lowers total economic cost.
  • Any quantified saving, scrap reduction, carrying-cost reduction, or return on investment.
  • That AI or a dashboard can identify an optimal quantity without complete and timely production, demand, and inventory data.
  • That the incumbent lacks learning-curve functionality.
  • That the product natively calculates expected stock value or inventory carrying cost.
  • That current on-hand or available stock quantity is expected stock value.
  • That planned-versus-actual manufacturing cost is the same as total economic cost.
  • That the lowest historical production cost identifies the preferred future batch size.
  • That a smaller batch necessarily lowers total economic cost.
  • That a customer-supplied expected-stock or carrying-cost calculation exists before the customer provides and approves it.
  • That the configured extension is available out of the box or has a known implementation effort.
  • That historical cost or scrap relationships will continue unchanged.
  • That the mechanism automatically selects or releases a production quantity.

4. P_00007 — Quote requests require manual translation before processing​

Source: P_00007. Canonical priority: 45. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Do high-volume custom requests arrive through email and telephone and require manual interpretation into structured quote records before pricing can begin?

Tuple check: The tuple permits this situation but establishes neither request volume nor channel use. Clerical hiring is not confirmation of quote-intake work.

Finance framing: Use the canonical CFO question about people and time before a request becomes a priceable record. Do not assert errors, lost quotes, or labor savings.

Canonical CFO questions:

  • What does one quote request take, in people and time, before it is a record you can price?

Observable signals to look for; none is assumed present:

  • Quote requests arrive through both email and telephone.
  • The company states there is no automated intake.
  • Staff manually create the internal request before consulting price and schedule information.

Disconfirming signals:

  • Requests arrive through required structured fields or a verified import that creates the internal quote record without rekeying.
  • A sample of email and telephone requests enters the quoting workflow without manual interpretation or transcription.

Evidence needed to test the problem: A representative sample of quote requests showing the steps and staff time between receipt and creation of a complete internal quote record.

Ordered downstream chain: S_00006 — Request content converted into reviewed quote drafts (approved) → PF_MULTI_005 (approved, directly listed for M1_V2).

Stored solution mechanism, subject to its conditions and proof limits: Capture inbound email text, telephone transcripts, or uploaded quote documents through an available intake channel. For multilingual uploaded content, apply configured AI language normalization before extraction and matching populate the account, product, quantity, destination, and timing fields of a structured quote draft. Several uploaded requests may enter the same batch intake while retaining one source and reviewable draft per request. After a person confirms or corrects each draft, submit it through the native quote validation and calculation path.

Capability in the solution recordClassificationRequired conditions
Ingest email text or telephone transcripts into the quote-intake workflowintegratedEmail requires a connection to the customer's inbound mail source. Telephone requests require an external transcript or equivalent text capture. No specific inbound-email or telephony connector was verified in MCP server d8189168. Evidence: none attached to this capability.
Upload quote documents into AI-assisted quote intakeconfiguredThis capability was reported through buyer interviews and was not independently verified through MCP server d8189168. Accepted file formats, size limits, security controls, and source retention must be confirmed. Each uploaded document must remain associated with its resulting draft. Evidence: EV_MULTI_007.
Normalize multilingual quote content before field extractionconfiguredLanguage coverage must be validated against representative requests received by the customer. No universal language support is established. Identifiers, quantities, units, addresses, and commercial terms must remain reviewable against the source. No multilingual translation implementation was verified through MCP server d8189168. Evidence: EV_MULTI_007.
Extract and match account, product, quantity, destination, and timing informationconfiguredThe customer must provide representative requests and define the required quote fields. Product terminology must map to maintained account, item, variant, packaging, warehouse, and unit records. Ambiguous or missing values must be routed to review. No dedicated inbound-request-to-sales-quote implementation was verified. Evidence: EV_MULTI_007.
Process multiple uploaded quote requests through one batch intakeconfiguredThis capability was reported through buyer interviews and was not independently verified through MCP server d8189168. Each source request must produce an independently reviewable result. Batch limits, partial-failure handling, retries, and duplicate handling remain unverified. Evidence: EV_MULTI_007.
Create a structured draft sales quotenativeRequired account, contact, product, quantity, warehouse, destination, and shipping-date values must resolve. The native create path accepts structured data; it does not interpret raw communication itself. Evidence: none attached to this capability.
Review and correct the structured quote before processingnativeA staff member must review missing, ambiguous, or low-confidence values. The source request must remain available during review. Evidence: none attached to this capability.
Validate and calculate the confirmed quotenativeCalculation begins only after valid structured line data exists. Correct price and timing depend on maintained product, pricing, capacity, and scheduling inputs. The observed quote-planning hook does not independently verify the complete buyer-visible calculation. Evidence: none attached to this capability.

Proof readiness and boundaries: PF_MULTI_005 defines one 1,000-request multilingual batch, one reviewable draft per source, at most 50 mismatched complete quotes before correction, stored accepted drafts, and aggregate start-to-send time no greater than one-third of the comparable prior-process aggregate. These are bounded acceptance criteria, not verified general results. EV_MULTI_007 is contributor-reported call learning; raw requests, database values, timestamps, language list, adjudication, and timing method were not inspected. Upload, translation, extraction, and batch intake were not independently verified through product MCP; email and telephone connectors are also unverified. Fix the evaluation package, fields, truth set, languages, timestamp definitions, and aggregation before execution. The proof’s outstanding prose says approved status prevents generation despite its approved YAML: preserve this source contradiction as an unresolved review issue, without changing the stored lifecycle.

Acceptance criterion for a future representative test; not a reported result: The 1,000-request batch returns exactly 1,000 source-associated, independently reviewable drafts; no more than 50 complete quotes are mismatched before manual correction, where any missing or differing required field fails the complete quote; every reviewer-accepted valid draft selected for submission produces an inspectable stored sales/quote draft; and, under this proof's explicit interpretation of "3x faster," the configured workflow's aggregate start-to-send elapsed time is no more than one-third of the prior-process aggregate for the same or a comparable 1,000-quote set using the same predeclared timestamp definitions and aggregation method.

Proof evidence: EV_MULTI_007.

Solution limitations:

  • Uploaded-input, multilingual translation, and batch-processing implementations were not verified through MCP.
  • Language coverage is not universal and must be tested against representative customer requests.
  • Translation and extraction can produce mismatches, so human review remains necessary.
  • Batch capacity, partial-failure behavior, retry behavior, and duplicate handling are unknown.
  • The buyer-accepted maximum is 5% mismatched complete quotes in the reported 1,000-quote batch; the raw data and adjudication procedure were not inspected.
  • Price and timing correctness depend on complete and maintained operational data.
  • The proportion of requests requiring correction and the implementation effort are not established.

Do not assert — canonical problem and solution restrictions:

  • That manual intake currently causes errors, slow response, or lost quotes without account evidence.
  • That every request can be interpreted automatically.
  • Any quantified labor saving or response-time improvement.
  • That the AI supports every language.
  • That every quote request can be translated or processed automatically.
  • That translated or extracted values are correct without review.
  • That the AI has a verified 5% error rate.
  • That more than 100 quotes per day can be processed without a capacity test.
  • That price or timing is instant or correct without validation.
  • That quotes are sent faster without a measured baseline and observation.
  • Any quantified labor, accuracy, throughput, or turnaround improvement.
  • That the mechanism removes human judgment from custom quoting.

5. P_00010 — Management questions require spreadsheet reconstruction outside the operating system​

Source: P_00010. Canonical priority: 50. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Must management reporting be reconstructed after export even though the underlying transactions already exist in the operating system?

Tuple check: The situation does not require a named system or several sites. Confirm representative reporting modalities; one spreadsheet export does not establish that every report requires reconstruction.

Finance framing: Use both canonical CFO questions, preserving their order: production of purchasing or inventory analysis, then reconciliation to source transactions.

Canonical CFO questions:

  • How do you produce a purchasing or inventory analysis from the transactions?
  • When a report has been prepared, how do you tie it back to the transactions in the operating system?

Observable signals to look for; none is assumed present:

  • Users cannot produce a ranked list of top-selling products from the operating system.
  • Vendor or purchasing analysis requires an export followed by spreadsheet work.
  • The company states that every reporting modality depends on Excel.
  • A requested management report is assembled outside the system that owns the transactions.

Disconfirming signals:

  • Users generate a representative set of the company's required reports directly from the operating system with the required filters, rankings, and calculations.
  • The generated reports refresh from current transactions and reconcile to the underlying records without spreadsheet reconstruction.

Evidence needed to test the problem: A representative sample across the company's reporting modalities, the source transactions for each sample, the exact export and spreadsheet steps currently performed, and a reconciliation of each result to the source records.

Ordered downstream chain: S_00009 — Management views over the live operating record (approved) → no proof selected.

Stored solution mechanism, subject to its conditions and proof limits: Implement recurring management questions as in-system transaction-table queries, pivots, aggregations, and dashboard widgets over the sales, purchasing, inventory, manufacturing, and finance records that own the activity. Configure each view's fields, filters, groupings, calculations, ranking, and time basis once, then rerun it against current records rather than exporting the records and reconstructing the answer in a spreadsheet.

Capability in the solution recordClassificationRequired conditions
Filter, sort, group, aggregate, and pivot supported transaction tablesnativeThe source table must be connected to the implemented search-and-aggregate-with-pivoting path. The required fields must exist and support the requested operation. Nested fields and relationships may require explicit query configuration. Results remain subject to the user's record-access permissions. Evidence: none attached to this capability.
View configured dashboard charts with date ranges, zoom, and downloadnativeThe dashboard and its referenced chart definitions must already exist. The requested metric must be available through the configured chart data source. Dashboard visibility remains subject to configured access. Evidence: none attached to this capability.
Configure recurring management views and dashboard widgets for account-specific questionsconfiguredThe customer must supply representative reports and define each metric, grouping, ranking, filter, and reporting period. Cross-document views require verified relationships and consistent treatment of units, currencies, statuses, and dates. Each configured result must be reconciled to representative source transactions. Configuration and testing effort cannot be sized before the reports, source fields, and relationships are inspected. A ranked top-selling-product or vendor analysis remains unverified until its exact field mapping and calculation are tested. Evidence: none attached to this capability.

Proof readiness and boundaries: S_00009 has proofIds: []. There is no reached proof and no proof-transfer decision to make. Its configured reports require verified fields, joins, units, currencies, statuses, dates, permissions, and reconciliation. A general self-service dashboard builder and uniform support across every document are unverified. No claim that Excel or all manual analysis disappears is supported.

Solution limitations:

  • The implementation does not establish that every requested management report exists out of the box; account-specific reports require configuration and testing.
  • Native report/export settings are not uniformly enabled across every source document, so the same reporting path cannot be assumed for all record types.
  • Cross-document calculations remain dependent on correct joins, field mappings, units, currencies, statuses, and reporting-period definitions.
  • Missing, incomplete, or inconsistently recorded transactions produce incomplete or misleading views.
  • A general end-user self-service dashboard builder was not verified in MCP server d8189168.
  • One-off scenario modelling or analysis that is not represented in the configured data model may still require an external analytical tool.

Do not assert — canonical problem and solution restrictions:

  • That a named ERP is generally incapable of reporting.
  • That every company using a named ERP must export every report.
  • Any quantified delay, labor cost, or error rate without account evidence.
  • That a replacement system will eliminate all manual analysis.
  • That the mechanism eliminates Excel or all manual analysis.
  • That every management-reporting modality is available out of the box.
  • That a top-selling-product, vendor, purchasing, inventory, manufacturing, or accounting report is correct before reconciliation with representative source transactions.
  • That all transaction tables support identical fields, pivots, or aggregations.
  • That dashboards are universally self-service for end users.
  • That queried results update continuously without rerunning the view.
  • Any quantified delay, labor, accuracy, or error-rate improvement.

6. P_00011 — Recorded inventory cannot be reconciled to physical stock​

Source: P_00011. Canonical priority: 45. Statement type: market_hypothesis. Account state: unknown.

Applicability hypothesis: Do physical counts differ from recorded stock while available movement history fails to explain where the variance entered?

Tuple check: Transaction-driven stock can exist at one site with any system identity. Confirm a variance and the outcome of transaction review; the tuple establishes neither.

Finance framing: Use the canonical CFO questions about explaining book-to-count differences and their appearance in reported figures. A counted balance adjustment does not establish financial reporting accuracy.

Canonical CFO questions:

  • When the book quantity and a physical count differ, how do you find the transactions that explain the difference?
  • How does an inventory difference show up in the figures you report?

Observable signals to look for; none is assumed present:

  • A physical count differs from the quantity recorded by the operating system.
  • The company describes its inventory counts as unreliable.
  • Users report unexplained glitches while inventory quantities are maintained.
  • The team cannot identify which transaction or process created a variance.

Disconfirming signals:

  • Representative cycle counts reconcile to recorded quantities within an agreed tolerance across materials, work in process, and finished goods.
  • A controlled item journey through receipt, consumption, production, and shipment produces the expected quantities and identifiable adjustments.
  • Sample variances can be traced to documented timing differences or pending transactions and resolve through the normal process.

Evidence needed to test the problem: A representative physical-count sample, the corresponding recorded quantities, all relevant movement transactions, the resulting variances, and the outcome of recount and transaction review.

Ordered downstream chain: S_00010 — Cycle-count reconciliation through posted inventory adjustments (approved) → PF_M1_V2_001 (approved, directly listed for M1_V2).

Stored solution mechanism, subject to its conditions and proof limits: Compare physical counts with current on-hand stock by warehouse and the configured item or lot strategy. After review, apply approved differences that exceed the maintained tolerance through posted inventory adjustment movements, updating the recorded stock while preserving the correction in the movement history. Use the movement sequence and recorded adjustment context to investigate later variances rather than silently overwriting the system balance.

Capability in the solution recordClassificationRequired conditions
Compare counted quantity with current on-hand stocknativeThe cycle count must identify the correct warehouse, item, unit, location, and lot where applicable. Counts must be performed and entered accurately. The recorded stock position is recalculated before the count is completed. Evidence: none attached to this capability.
Configure cycle-count strategy, schedule, tolerance, and approvalconfiguredThe customer must define whether counts operate by item or lot. The customer must define item tolerances, count frequency, responsible roles, and approval policy. Configuration and testing effort cannot be sized before the inventory process and master data are inspected. Evidence: none attached to this capability.
Post approved discrepancies as inventory adjustment movementsnativeOnly approved discrepancies outside the configured tolerance produce adjustment movements. Valid warehouse, location, item, unit, cost, and inventory-setting data must resolve. Financial posting depends on the configured inventory accounts and posting rules. Evidence: none attached to this capability.
Search stock-movement history by movement, product, location, lot, quantity, operation, creator, and timenativeThe history contains only movements recorded through the implemented inventory movement path. Users remain subject to configured record-access permissions. Evidence: none attached to this capability.
Require contextual reasons and review details for inventory adjustmentsconfiguredThe customer must require staff to record a meaningful reason because the implementation field is optional. Adjustment access, approval, and review responsibilities must be configured. Evidence: none attached to this capability.

Proof readiness and boundaries: PF_M1_V2_001 is directly scoped to one representative single-site injection-molding workflow. EV_M1_V2_001 records structured internal confirmation that the resulting balance matched the approved count and a matching adjustment was visible. No safe artifact, raw quantities, customer identity, employee count, system identity, or execution timestamp was inspected. Confirm stock identity, tolerance, approval, locations, and concurrency conditions before execution. Financial postings were not validated. The mechanism corrects the recorded quantity through a traceable movement; it does not identify the original cause, detect unrecorded events, prevent future variances, or guarantee inventory accuracy.

Acceptance criterion for a future representative test; not a reported result: The test passes when the post-completion on-hand quantity equals the approved counted quantity for the same warehouse, item, unit, location, and applicable lot; the posted movement quantity equals the approved count minus the recorded pre-completion quantity with the correct direction; and a completed matching adjustment or stock-movement record remains inspectable. Any unexplained balance difference, missing movement, wrong stock identity, wrong movement direction, or movement quantity mismatch fails the test.

Proof evidence: EV_M1_V2_001.

Solution limitations:

  • The mechanism does not reconstruct or identify the transaction or process that originally caused a pre-existing variance.
  • It cannot detect a physical receipt, movement, consumption, production event, or shipment that was never recorded.
  • Movement history provides traceability but no verified automatic root-cause or first-divergence analysis.
  • Count timing, concurrent movements, incorrect units, wrong locations, and counting errors can create apparent differences.
  • Tolerance, approval, removal strategy, location, and financial-account configuration must be tested before use.
  • MCP verification provides no accuracy, latency, concurrency, or reconciliation-effectiveness measurements.

Do not assert — canonical problem and solution restrictions:

  • That the ERP vendor or application code causes the variances before diagnosis.
  • That employees are responsible for inaccurate inventory.
  • That the mismatch causes stockouts, delays, or financial loss without account evidence.
  • That replacing the system will make inventory accurate.
  • That replacing the incumbent system makes inventory accurate.
  • That the mechanism automatically identifies the first incorrect transaction or the root cause of a variance.
  • That every physical inventory event is captured without a controlled process test.
  • That completing an adjustment prevents future inventory differences.
  • That a variance proves theft, waste, employee error, or an application defect.
  • Any quantified reduction in inventory variance, counting effort, loss, delay, or financial impact.

Competitive context​

1. C_00002_DELMIAWORKS — DELMIAworks​

The selected competitor profile resolves with matching filename and ID, kind: competitor_profile, schema 1, and status: approved. Its review and implementation checks are dated 2026-10-13. The following is a projection of that dated canonical record; it is not a fresh product comparison or an account's incumbent assessment.

Strengths reported in the profile's reviews: ERP and shop-floor execution on one database, production visibility, inventory and purchasing control, molding-specific cycle-time and cavity data, and support. Machine telemetry is credited in individual reviews; do not generalize one report to universal product behavior.

Limitations reported in those reviews: training and learning effort, demanding implementation, dated-interface experiences, upgrade and fix problems, report-format and customization work, cost concerns, and difficulty with some non-standard processes. The visible G2 material dates from 2019–2021; Capterra observations cited are from 2025–2026. Experiences differ, and many visible reviews were incentivized or vendor-invited. These are review-reported experiences, not universal product facts.

Canonical discovery questions, available only as relevant context:

  • Which shop-floor data do your teams rely on in real time, such as machine signals, cycle times, OEE, or labor reporting? Which of it comes straight from machines, and which do operators enter?
  • How do you plan and test system updates today, and what has an update changed for the people doing the work?
  • Which reports do people rebuild in a spreadsheet or pay to customize, and who maintains them?
  • Which processes do you run differently from the standard system path, and who makes those changes: your team, the vendor, or a partner?
  • How long does a new planner, buyer, or supervisor take to work in the system without help?
  • How do planners see future supply and demand by period, and trace a requirement back to the order that created it?

The competitor record recommends testing one actual workflow, classifying every requirement, and defining acceptance criteria before recommending replacement. Its product observations support production reporting and OEE from declared production; machine capture, Builder adaptation, upgrade behavior, and a wired report-export action remain unverified in that record. Extrusion-specific production-report costing is not molding proof.

Prohibited competitor claims:

  • Do not generalize that DELMIAworks is outdated, hard to use, unstable, or a poor fit for every manufacturer; do not question review authenticity.
  • Do not turn one review into a universal planning, rigidity, or telemetry claim, or omit the age of visible G2 observations.
  • Do not claim Naologic is faster, easier, cheaper, more modern, easier to upgrade, implementation-free, or consultant-free without a buyer-specific test.
  • Do not claim native Naologic machine telemetry or direct machine connections, or equate OEE from declared production with machine-measured OEE.
  • Do not promise response time at any data volume or concurrency without a test.
  • Do not present configured, integrated, or roadmap work as native.

Activation and evidence blocker: The YAML establishes audience relevance only. Account use or evaluation is unknown. Matching account or buyer-confirmed evidence is required before executable competitor-specific language. The profile cites dated review pages and product MCP checks, rather than canonical EV_ records; those references do not establish an account's experience or a measured comparative outcome. Missing account activation does not independently block an otherwise eligible generic call sheet.

Review sources recorded by the canonical profile: G2 reviews and Capterra reviews, both read 2026-10-13. No review scores are refreshed or inferred here.

Audience-specific framing and do not assert​

framing: null supplies no deliberate lead_with, outcome_bar, or do_not_assert override. market_persona: null and discovery_plan: null also supply no overrides. No audience-specific primary job or finance responsibility has been invented. CFO discovery framing is limited to the canonical question lists and the selected records' boundaries.

  • Keep each problem and signal interpretation a labeled question until evidence establishes it. No selected problem is an account fact.
  • Do not name an incumbent while the system selection is [unknown].
  • Do not introduce multi-site consolidation or per-site profit framing into this single-site audience.
  • Do not turn ownership, age, or clerical hiring into a proven budget, reporting exemption, legacy problem, or labor saving.
  • Do not claim a five-times return or any other quantified outcome from the family-owner gate.
  • Do not claim reservation, autonomous scheduling, global optimization, material feasibility, maintenance capability, or molding physics beyond the bounded scheduling and quoting records.
  • Do not describe historical production cost as total economic cost, native expected-stock value, carrying cost, expected scrap, or an optimal batch.
  • Do not treat batch-test acceptance thresholds or reported interview timing as verified general accuracy or speed.
  • Do not promise every management report out of the box, universal self-service dashboards, removal of Excel, or continuously updating results without rerun.
  • Do not describe a cycle-count adjustment as root-cause diagnosis, guaranteed inventory accuracy, or validated accounting accuracy.
  • Apply all problem, solution, proof, and competitor restrictions above; no configured, integrated, roadmap, or unavailable path becomes native here.

Outstanding before approval or call-sheet generation​

The source remains approved; enrichment does not change that state. Hard configuration and reference checks pass. W11 is not eligible. The following unresolved requirements remain visible without repairing sources.

  1. Market-persona binding is absent. P2 resolves and is admitted by the vertical, but role labels, transaction roles, responsibility hypothesis, and primary job remain unknown. No YAML override fills them. The generation specification requires a binding for this vertical and persona.
  2. The first selected problem has no CFO question. P_00006 has neither cfo_questions nor populated confirmation_questions. Five other selected problems have CFO questions. Canonical priority 45 is shared by P_00006, P_00007, and P_00011; the default lowest-priority rule supplies no tie-break. YAML order is preserved, with P_00006 first. Do not invent a question or silently reorder the audience.
  3. Problem evidence remains absent. All six selected problems have evidence_ids: []. P_00013 explicitly retains its supporting observation in a provisional inbox item. Complete evidence authoring before presenting customer-derived mismatches as externally supported claims. Preserve all market hypotheses as questions meanwhile.
  4. Capability-level evidence is incomplete. Every capability in S_00005, S_00012, S_00009, and S_00010 has an empty evidence list; several in S_00003 and S_00006 do too. Reached proof evidence does not silently populate those fields or establish wider claims.
  5. Reporting has no generation chain. P_00010 → S_00009 ends at proofIds: []. Configuration, exact report field mappings, and source reconciliation remain untested for the account.
  6. Scheduling proof is narrower than its solution. PF_MULTI_003 supports one explicit reflow, not initial allocation or load balancing. Verify customer constraints, dependencies, started-work behavior, and shift calendars before using broader scheduling language. Quantified performance and freight optimization remain unsupported.
  7. Quoting proof does not reserve a slot. PF_MULTI_002 supports bounded pre-commit planning and production-cost comparison. It does not establish material feasibility, molding-specific setup behavior, or a realized margin outcome. Rates, schedules, complete production capture, representative work-center/warehouse setup, and configured finance views remain prerequisites.
  8. Batch economics is incomplete and unexecuted. S_00012 lacks native expected-stock valuation and carrying cost; no customer extension method or inputs are supplied. PF_MULTI_006 has never run, its declared 20–100 employee context does not validate these larger bands, and its direct vertical breadth lacks per-vertical evidence. Fix comparison scope, costing strategy, ordered-quantity mapping, factor, tolerance, and planner acceptance. The solution's confirmed-sales-order-status wording also needs source review.
  9. Quote-intake execution and interpretation remain unsettled. Fix the PF_MULTI_005 package, languages, fields, truth set, timestamps, and timing aggregation. Connectors, upload/translation/batch implementations, failure handling, and commercial-value correctness remain unverified as described above. Its prose statement that approved status prevents generation conflicts with its approved YAML and must be reconciled by source review.
  10. Inventory evidence is bounded. Inspect the PF_M1_V2_001 fixture, configuration, stock identity, and tolerance. Its observation does not establish employee-band or incumbent coverage, accounting accuracy, original-cause diagnosis, or prevention of future variances. Those wider claims remain blocked even though the vertical and single-site scope match.
  11. Competitive language is not activated. DELMIAworks is approved context, but no account or buyer-confirmed evidence establishes use or evaluation. Dated review citations and product MCP references do not supply that evidence or prove a comparative result. This limits competitor-specific execution; it is not an independent generic-generation blocker.
  12. Signal framing and optional guidance remain unconfirmed. Signal coverage is unmeasured; the founder and AI interpretations are hypotheses. No selected proof establishes the family-owner step-change threshold. Selection rationales, audience-specific discovery plan, and framing are unknown. Their null values are not malformed configuration, and enrichment supplies no deliberate override.

These findings distinguish valid configuration from generation readiness. No call sheet is generated, no dependency is approved, and no source is repaired.

Canonical configuration​

This profile is enriched from M1_V2-P2-A01.yaml. Edit that file and rerun enrich-audience; do not edit this profile as the source.

Source records​

SourceAuthority or resolved content
M1_V2-P2-A01.yamlSelection, order, lifecycle, definition tuple, rejected reasons, and null overrides
Market catalogM1 meaning and operating status
Vertical catalogM1_V2, market membership, persona admissibility, process scope, and proof-transfer boundaries
Persona catalogP2, generic finance function and title matching; no market-persona binding
VariablesLifecycle and controlled enums; size, site, system, signal, capability, and transfer values
SignalsSelected SG_001, SG_024, SG_025, SG_017; rejected SG_002, SG_003, SG_015, SG_019; meanings and hypothesis provenance
Signal detectionCollection sources, observables, refresh, cost, defaults, and unmeasured coverage
Sales asset formatAudience schema and call-sheet eligibility, selection, and evidence rules
WorkflowsS4, W10E, and W11 boundaries
P_00006Committed orders are sequenced through manual asset-by-asset judgment; approved, market_hypothesis, priority 45
S_00005Generated work-center allocation and schedule reflow; approved, capability classifications and limits
P_00003Price and delivery date are committed without confirming the producing asset; approved, market_hypothesis, priority 55
S_00003Quoting bound to the production schedule; approved, capability classifications and limits
P_00013Production quantity cannot be selected from total economic cost; approved, market_hypothesis, priority 50
S_00012Reviewed production-cost comparison by order quantity; approved, capability classifications and limits
P_00007Quote requests require manual translation before processing; approved, market_hypothesis, priority 45
S_00006Request content converted into reviewed quote drafts; approved, capability classifications and limits
P_00010Management questions require spreadsheet reconstruction outside the operating system; approved, market_hypothesis, priority 50
S_00009Management views over the live operating record; approved, capability classifications and limits
P_00011Recorded inventory cannot be reconciled to physical stock; approved, market_hypothesis, priority 45
S_00010Cycle-count reconciliation through posted inventory adjustments; approved, capability classifications and limits
PF_MULTI_003Production work-order reflow with inspectable planned-date changes; approved, direct listed scope with bounded acceptance and evidence
PF_MULTI_002Pre-commit work-center planning and planned-versus-actual margin; approved, direct listed scope with bounded acceptance and evidence
PF_MULTI_006Reconcilable production-cost comparison across completed run quantities; approved, direct listed scope with bounded acceptance and evidence
PF_MULTI_005Multilingual quote batch accuracy and start-to-send timing; approved, direct listed scope with bounded acceptance and evidence
PF_M1_V2_001Cycle-count balance reconciliation with a traceable adjustment movement; approved, direct listed scope with bounded acceptance and evidence
EV_PRODUCT_005Manufacturing work-order reflow action, data model, and scheduling boundaries; internal_validation, confidence medium, accessed 2026-08-01
EV_MULTI_005Buyer-observed work-order reprogramming through reflow and date editing; buyer_interview, confidence high, accessed 2026-08-01
EV_MULTI_004Buyer-observed pre-commit work-center planning; call_learning, confidence medium, accessed 2026-08-01
EV_PRODUCT_002Manufacturing planned and actual unit-cost calculation path; internal_validation, confidence medium, accessed 2026-08-01
EV_MULTI_003Expert observation of production margin comparison; internal_validation, confidence medium, accessed 2026-08-01
EV_PRODUCT_006Cross-order manufacturing cost comparison surface and costing-strategy scope; internal_validation, confidence medium, accessed 2026-08-02
EV_MULTI_007Reported buyer evaluation of multilingual quote batch processing; call_learning, confidence medium, accessed 2026-08-01
EV_M1_V2_001Internal confirmation of cycle-count reconciliation and adjustment traceability; internal_validation, confidence medium, accessed 2026-08-02
C_00002_DELMIAWORKSApproved dated competitive context, review-source limits, discovery, and prohibited claims