M1_V1-P3-A02 — Plastic extrusion COO, 100–500 and 500–1000 employees, 2–20 sites
Audience summary
This audience selects plastic extrusion companies in the 100–500 and 500–1000 employee bands that run 2–20 operating sites. Their systems of record are configured as the combination QuickBooks, SAP, and custom-built software. The contact is the COO, the operations and manufacturing function. No company signal is required beyond that definition.
Use this profile to prepare first-call discovery. It doesn't establish that a selected account has any of the problems below. All six are market hypotheses with no account evidence, so open each one as a question, listen for both confirming and disconfirming answers, and drop a theme when the account's answer rules it out.
The source configuration is approved, but this profile is not a call sheet
and doesn't make the audience call-sheet-ready. There's no market-persona
binding for M1_V1 and P3, no selected problem has a Q&A record, and two of
the six problem chains reach no proof usable in M1_V1. See
Outstanding before approval or call-sheet generation.
The two selected competitor profiles are relevant context for this audience. Selecting them doesn't mean any account uses or is evaluating either product.
Definition tuple
| Dimension | Controlled value | Resolved meaning | Source |
|---|---|---|---|
| Market | M1 | Vertical core (active, priority 1) | markets_catalog.md |
| Vertical | M1_V1 | Plastic extrusion (active, priority 1, atlas anchor) | market_verticals_catalog.md |
| Persona | P3 | COO — operations and manufacturing | persona_list.md |
| Company size | 100_500, 500_1000 | 100–500 employees; 500–1000 employees (YAML order) | variables.yaml company_size |
| Location footprint | multi_site_2_20 | 2–20 operating sites | variables.yaml location_footprint |
| Systems of record | quickbooks, sap, custom_built | QuickBooks, SAP, and custom-built software (catalog order) | variables.yaml system_of_record |
M1_V1belongs toM1and listsP3in itspersona_ids. That list is a membership constraint, not a market-persona binding.M1_V1covers atlas micro marketsM2.3.5(industrial film and sheet only),M2.3.7(the anchor product segment),M2.3.8,M2.3.9,M2.3.10,M2.3.11,M2.3.12,M2.3.14(verified extrusion operations only), andM2.3.15. A NAICS code is a list-building aid. Verify the establishment's actual production process before treating an account as part of this vertical. Rubber extrusion belongs here only when extrusion is the dominant process.variables.yamldefines a system of record as a system that holds any part of the operating record. The catalog treats the combination, not any single member, as what decides the problem set, the migration story, which integration claims are allowed, and whether proof transfers. Which system holds which part of the record isn't a pre-call fact.variables.yamlnotes that the single-site to multi-site boundary changes content, because multi-site operations manage results per site against a general ledger that usually stays single.size_band_basisandsystems_of_record_basisarenull: the reason for each selection isn't recorded.
Pre-call selection predicate
The configured signal_predicate is empty, so selection uses only the
definition tuple:
M1 vertical core
+ M1_V1 plastic extrusion
+ P3 COO
+ 100–500 or 500–1000 employees
+ 2–20 operating sites
+ systems of record: quickbooks, sap, custom_built
There are no rejected_signals. Don't add an informal technology, hiring,
title, or account-behavior gate when building a list from this profile.
First-call discovery plan
The YAML has no audience-specific discovery_plan. The plan below comes from
the definition tuple and the selected canonical problem records. Every
condition starts as unknown. An answer shapes the conversation; it never
changes the definition tuple or moves an account into or out of this audience.
| # | Condition to resolve | Source | Starting state |
|---|---|---|---|
| 0 | Which of QuickBooks, SAP, and the custom-built software holds orders, production, inventory, and the general ledger? | variables.yaml system_of_record; P_00002 situation | unknown |
| 1 | Do two or more of the sites produce, and across them is revenue recorded against the customer and order while consumption, hours, and scrap are recorded against production, with nothing reconciling them per site or per unit? | P_00002 | unknown |
| 2 | Does a high volume of custom quote requests arrive by email and telephone, and must a person interpret and enter each one before quoting can begin? | P_00007 | unknown |
| 3 | Do management questions require exporting records from the operating system and rebuilding the answer in a spreadsheet? | P_00010 | unknown |
| 4 | Do physical counts differ from recorded inventory without the transaction history showing where the variance entered? | P_00011 | unknown |
| 5 | Is the company planning to replace a system that holds linked operating records, and has it tested a complete export that keeps those records connected? | P_00012 | unknown |
| 6 | Does the company choose between materially different run quantities of the same item, and can it compare production cost, expected scrap, demand, and carrying cost together? | P_00013 | unknown |
Don't force every theme into one conversation. Follow the first confirmed condition, test its disconfirming conditions, and ask for the one representative artifact or example named under Evidence to request before discussing a solution.
Market-persona context
No canonical market-persona binding exists for M1_V1 and P3; the
repository has no market_persona_catalog record. The YAML sets
market_persona: null, so there's no audience-specific override either.
What the persona catalog establishes:
- Persona:
P3COO, function "Operations and manufacturing". - Catalog description: This function is generally accountable for operating performance, capacity, production, delivery, and cross-functional execution.
- Common titles, for contact matching only: Chief Operating Officer, Vice President of Operations, Vice President of Manufacturing, Operations Director, Plant Manager. A title doesn't prove authority, ownership of a problem, motivation, or a transaction role.
| Binding field | Value |
|---|---|
Role labels in M1_V1 | unknown |
| Expected transaction roles | unknown |
| Responsibility hypothesis | unknown |
| Primary job | unknown |
No primary-job hypothesis is rendered, because no canonical binding or labeled override supplies one. Don't infer one from the job title or the catalog description. The YAML sets no persona-specific priority or framing, so this profile doesn't say which selected problems a COO owns.
Selected problems
Problems appear in YAML order. The YAML sets no audience-specific priority, so
each problem shows its canonical priority. Every problem is a
market_hypothesis with evidence_ids: [] and confirmation_questions: [].
Chain readiness
| Order | Problem | Solution (status) | First proof (status) | Proof owner | Proof scope for M1_V1 | Readiness |
|---|---|---|---|---|---|---|
| 1 | P_00002 | S_00002 (approved) | PF_MULTI_002 (approved) | CFO | Direct: M1_V1 listed | Reaches proof |
| 2 | P_00007 | S_00006 (approved) | PF_MULTI_005 (approved) | sales | Direct: M1_V1 listed | Reaches proof; proof not yet executed |
| 3 | P_00010 | S_00009 (approved) | none (proofIds: []) | — | — | Blocked: no proof |
| 4 | P_00011 | S_00010 (approved) | PF_M1_V2_001 (approved) | sales | Not listed; transfer prohibited | Blocked: no proof usable in M1_V1 |
| 5 | P_00012 | S_00011 (approved) | PF_MULTI_007 (approved) | sales | Direct: M1_V1 listed | Reaches proof; no measured values |
| 6 | P_00013 | S_00012 (approved) | PF_MULTI_006 (approved) | COO | Direct: M1_V1 listed; breadth not evidenced per vertical | Reaches proof; proof never executed |
A proof's owner names the role accountable for running that proof.
PF_MULTI_006 is the only reachable proof owned by the COO role. That's a
proof field, not a persona binding: it doesn't establish that the COO at a
selected account would run the proof or owns P_00013.
1. P_00002 — Margin cannot be stated per site or per unit
Canonical priority: 70 · Statement type: market_hypothesis ·
Status: approved
Tuple check: Compatible. The situation requires a company that runs more than one plant, and this audience runs 2–20 operating sites, though the tuple doesn't say how many of those sites produce. The situation also requires the general ledger to sit in an accounting package apart from the operating system, and work costed in a different unit from the one it's quoted in. The tuple doesn't settle any of these conditions. Ask.
Hypothesis to test: Across its plants, does the company record revenue against the customer and order while material consumption, hours, and scrap are recorded against production, with nothing reconciling the two at the level of one site or one unit? Is its work costed in a different unit from the one it's quoted in?
Listen for:
- The company states that it costs its work in one unit and quotes in another.
- The general ledger sits in a separate package from the operating system.
- Scenario or forecast analysis is described as something finance wants rather than something it produces.
- Per-site results are described as a manual exercise, or not produced at all.
- Scrap rate is described as unknown or as an overhead line.
Disconfirm when:
- The company produces per-site results from its systems on a schedule, without manual assembly.
- Margin per unit is reported routinely and used in pricing decisions.
- The costing unit and selling unit are the same, or the system holds and applies the conversion automatically.
- Scrap is attributed to the job or line that produced it.
- A single system already holds both the operating record and the ledger.
Evidence to request: One specific margin or scenario question the company couldn't answer from its systems, the manual steps taken instead, and roughly how long they took.
Do not claim: that the company's reported margin or financial statements are wrong; that it's losing money on any product, line, or site; any quantified saving, recovered margin, or close-time reduction; or that it can't state margin per site or per unit before the account confirms it.
Solution — S_00002 One operating record with the ledger synchronized
(priority 70, approved). Quotes, orders, production, consumption, and
shipments sit in one operating record with the general ledger synchronized to
it, so margin by site and unit is read from that record, and the costing and
selling units are carried on the item.
- Native: quote-to-cash, inventory, and manufacturing on one operating record; costing and business intelligence views over that record.
- Integrated: general ledger synchronization with QuickBooks. It requires a QuickBooks account, and the ledger stays in QuickBooks.
- Configured: item-level costing unit, selling unit, and conversion; finance dashboards built with the customer.
- Roadmap: native financial module and year-end close. Never present it as available.
- Limitations: financial close stays in the accounting package; per-unit margin is only as good as production-time consumption and labor capture; multi-currency quoting is an open requirement; historic margin isn't reconstructed.
- Do not claim: a native financial module or year-end close; that the ledger moves off the incumbent accounting package; any quantified saving, recovered margin, close-time reduction, or accuracy figure; multi-currency or multi-unit quoting support; that existing reported financials are wrong.
- Audience note:
S_00002records a ledger integration with QuickBooks only. It records no SAP integration, so if an account's ledger sits in SAP, the ledger path is unestablished.
Proof — PF_MULTI_002 Pre-commit work-center planning and
planned-versus-actual margin (workflow test, owner CFO, approved). Before
commitment, two synthetic lines show every compatible work-center plan with
forecast production time, planned cost, delivery timing, and percentage
margin; after production, time tickets and production reports give actual
per-unit cost for planned-versus-actual comparison by warehouse and work
center. M1_V1 is listed directly. Capacity analysis is planning behavior: it
doesn't reserve a production slot, automate final sequencing, or replace human
scheduling judgment. The capacity calendar uses 24/7 helper behavior,
raw-material planning is unavailable, and preventive and predictive
maintenance aren't demonstrated. The proof doesn't cover QuickBooks
synchronization, native close, multi-currency quoting, historical margin,
delivery improvement, changeover reduction, or any quantified outcome.
Evidence: EV_PRODUCT_002, EV_MULTI_003, EV_MULTI_004.
2. P_00007 — Quote requests require manual translation before processing
Canonical priority: 45 · Statement type: market_hypothesis ·
Status: approved
Tuple check: Compatible. No tuple dimension addresses quote volume or intake channels. Ask.
Hypothesis to test: Does the company receive a high volume of custom quote requests by email and telephone, and must a person interpret and enter the product, quantity, destination, and timing before the internal quoting process can begin?
Listen for:
- Quote requests arrive through both email and telephone.
- The company states there's no automated intake.
- Staff create the internal request by hand before consulting price and schedule information.
Disconfirm when:
- Requests arrive through required structured fields or a verified import that creates the internal quote record without rekeying.
- A sample of email and telephone requests enters the quoting workflow without manual interpretation or transcription.
Evidence to request: A representative sample of quote requests showing the steps and staff time between receipt and a complete internal quote record.
Do not claim: that manual intake causes errors, slow response, or lost quotes without account evidence; that every request can be interpreted automatically; any quantified labor saving or response-time improvement.
Solution — S_00006 Request content converted into reviewed quote drafts
(priority 65, approved). Captured email text, telephone transcripts, or
uploaded quote documents become structured quote drafts through configured
language normalization, extraction, and matching. A person confirms or
corrects each draft before native validation and calculation.
- Native: create a structured draft sales quote; review and correct it; validate and calculate the confirmed quote.
- Integrated: ingest email text or telephone transcripts. No specific inbound-email or telephony connector was verified.
- Configured: upload quote documents; normalize multilingual content;
extract and match account, product, quantity, destination, and timing; batch
intake. All four cite
EV_MULTI_007; upload and batch intake were reported through buyer interviews and weren't independently verified in the product, and no multilingual translation or dedicated request-to-quote implementation was verified. - Limitations: language coverage isn't universal; human review remains necessary; batch capacity, partial-failure, retry, and duplicate behavior are unknown; price and timing correctness depend on maintained operational data.
- Do not claim: that the AI supports every language; that every request can be processed automatically; that extracted values are correct without review; a verified 5% error rate; more than 100 quotes per day without a capacity test; instant or correct price or timing without validation; faster sending without a measured baseline; any quantified improvement; that human judgment is removed from custom quoting.
Proof — PF_MULTI_005 Multilingual quote batch accuracy and start-to-send
timing (dataset test, owner sales, approved). One 1,000-request
multilingual batch must return one reviewable draft per request, no more than
50 mismatched complete quotes before correction, stored drafts for accepted
submissions, and aggregate start-to-send time no more than one-third of the
prior process. M1_V1 is listed directly. The evaluation package hasn't been
inspected, and the proof tests uploaded batch intake; it doesn't test email or
telephone capture, which is what P_00007 describes. Evidence:
EV_MULTI_007.
3. P_00010 — Management questions require spreadsheet reconstruction outside the operating system
Canonical priority: 50 · Statement type: market_hypothesis ·
Status: approved
Tuple check: Compatible. The configured combination includes systems that record operating transactions. The problem doesn't presume which one. With SAP in the combination, this record's prohibition on calling a named ERP incapable of reporting applies directly.
Hypothesis to test: Do the company's management reports depend on exporting records from the operating system and rebuilding the answer in a spreadsheet, because the reporting layer doesn't produce the views it uses?
Listen for:
- People can't produce a ranked list of top-selling products from the operating system.
- Vendor or purchasing analysis requires an export followed by spreadsheet work.
- The company states that every reporting modality depends on Excel.
- A requested management report is assembled outside the system that owns the transactions.
Disconfirm when:
- A representative set of required reports comes directly from the operating system with the required filters, rankings, and calculations.
- Those reports refresh from current transactions and reconcile to the underlying records without spreadsheet reconstruction.
Evidence to request: A representative sample across the company's reporting modalities, the source transactions for each, the exact export and spreadsheet steps, and a reconciliation of each result to the source records.
Do not claim: that a named ERP, including SAP, is generally incapable of reporting; that every company on a named ERP must export every report; any quantified delay, labor cost, or error rate without account evidence; that a replacement system eliminates all manual analysis.
Solution — S_00009 Management views over the live operating record
(priority 50, approved). Recurring management questions become in-system
queries, pivots, aggregations, and dashboard widgets over the records that own
the activity, configured once and rerun against current records.
- Native: filter, sort, group, aggregate, and pivot supported transaction tables; view configured dashboard charts with date ranges, zoom, and download.
- Configured: recurring management views and dashboard widgets for account-specific questions.
- Limitations: account-specific reports need configuration and testing; report and export settings aren't uniform across documents; cross-document calculations depend on joins, units, currencies, statuses, and periods; incomplete data produces misleading views; a self-service dashboard builder wasn't verified; one-off scenario modelling may still need an external tool.
- Do not claim: that Excel or all manual analysis goes away; that every reporting modality is available out of the box; that any report is correct before reconciliation with source transactions; that all tables support identical operations; that dashboards are universally self-service; that results update continuously without rerunning; any quantified improvement.
Proof: none. S_00009 has proofIds: []. This chain is blocked for
call-sheet use.
4. P_00011 — Recorded inventory cannot be reconciled to physical stock
Canonical priority: 45 · Statement type: market_hypothesis ·
Status: approved
Tuple check: Compatible. No tuple dimension contradicts transaction-driven inventory. Ask.
Hypothesis to test: Do the quantities the operating system records for materials, work in process, or finished goods differ from physical counts, without the available transactions showing where the variance entered?
Listen for:
- A physical count differs from the quantity the operating system records.
- The company describes its inventory counts as unreliable.
- Staff report unexplained glitches while inventory quantities are maintained.
- The team can't identify which transaction or process created a variance.
Disconfirm when:
- Representative cycle counts reconcile to recorded quantities within an agreed tolerance across materials, work in process, and finished goods.
- A controlled item journey through receipt, consumption, production, and shipment produces the expected quantities and identifiable adjustments.
- Sample variances trace to documented timing differences or pending transactions and resolve through the normal process.
Evidence to request: A representative physical-count sample, the matching recorded quantities, the relevant movement transactions, the resulting variances, and the outcome of recount and transaction review.
Do not claim: that the ERP vendor or application code causes the variances before diagnosis; that employees are responsible; that the mismatch causes stockouts, delays, or financial loss without account evidence; that replacing the system makes inventory accurate.
Solution — S_00010 Cycle-count reconciliation through posted inventory
adjustments (priority 50, approved). Physical counts are compared with
current on-hand stock, and approved differences beyond tolerance post as
inventory adjustment movements that stay in the movement history.
- Native: compare counted quantity with current on-hand stock; post approved discrepancies as adjustment movements; search stock-movement history.
- Configured: cycle-count strategy, schedule, tolerance, and approval; required contextual reasons for adjustments.
- Limitations: it doesn't identify the cause of a pre-existing variance; it can't detect events that were never recorded; there's no verified automatic root-cause analysis; count timing, concurrent movements, wrong units or locations, and counting errors can create apparent differences.
- Do not claim: that replacing the system makes inventory accurate; automatic identification of the first incorrect transaction or root cause; that every physical event is captured without a controlled test; that an adjustment prevents future differences; that a variance proves theft, waste, employee error, or a defect; any quantified reduction.
Proof — PF_M1_V2_001 Cycle-count balance reconciliation with a traceable
adjustment movement (approved) isn't usable here. Its vertical_ids is
[M1_V2], its transfer level is prohibited, and M1_V1 has no incoming
proof-transfer rules. This chain has no proof for this audience.
5. P_00012 — Replacement planning lacks a verified export of linked operating records
Canonical priority: 45 · Statement type: market_hypothesis ·
Status: approved
Tuple check: Compatible. The situation requires a planned replacement, which isn't a pre-call fact for this audience. Each configured system holds some part of the operating record, so the question applies to whichever system the company plans to replace. Ask.
Hypothesis to test: Is the company planning to replace a system that holds related manufacturing, purchasing, sales, inventory, or accounting records without having established its export rights, its extraction method, or whether linked records survive outside that system?
Listen for:
- The company can't state whether it owns or can retain all data the incumbent system holds.
- CSV export is assumed possible but hasn't been tested against the required record set.
- Operational and accounting records are tied together in the incumbent system.
- No completed export shows that document references stay connected.
- After a cutover, only part of the incumbent data is available in the replacement environment.
Disconfirm when:
- The company has run a complete documented export of the required record types, relationships, attachments, and history.
- Exported records were imported into a neutral or replacement environment and reconciled with row counts, control totals, and sampled relationships.
- Contractual access rights and a supported API, backup, or export process establish continued access independently of the incumbent application.
Evidence to request: An inventory of the record types and relationships needed for transition, the data-access terms, a test extraction, and an import reconciliation covering counts, financial control totals, attachments, and sampled document links.
Do not claim: that the incumbent vendor intentionally locks customers in; that unrecovered data is permanently lost; that a particular record type or relationship was omitted before it's identified; that CSV files preserve relationships or make a complete migration; that all history can move within a particular timeline or cost.
Solution — S_00011 Reconciled trial migration before cutover (priority
60, approved). Before cutover approval, a migration manifest, an authorized
test extract, staged import in dependency order, and reconciliation of counts,
control totals, exceptions, and sampled links gate the decision.
- Configured: the migration manifest, source-to-target map, and acceptance criteria; loading customer-supplied extracts through record-specific import paths; resolving supported cross-document references; diagnostic trial imports and reconciliation. All four capabilities are configured.
- Limitations: it can't establish export rights or extraction ability; import coverage for every record type isn't established; no universal path for attachments, audit history, or revision history was verified; some imports leave partially loaded batches; throughput at migration volume isn't verified; it can't recover what the source extract lacks.
- Do not claim: that a vendor prevents data access; that every record, relationship, attachment, or revision can migrate; that a CSV preserves relationships or proves completeness; that the import actions are a universal migration tool; that the target audit trail recreates the incumbent's; that a successful trial proves completeness without the approved criteria; any timeline, cost, or downtime; that no data will be omitted, duplicated, changed, or lost.
Proof — PF_MULTI_007 Reconciled sales-order and AR-invoice trial migration
before cutover (workflow test, owner sales, approved). One sanitized slice
of the buyer's authorized extract is dry-run, loaded, and reconciled against a
predeclared manifest; every record type carries a migrated, excluded, or
unresolved status before cutover approval. M1_V1 is listed directly. No
measured value backs the proof. Its evidence describes 25 accounts of 20–100
employees on a single site across M1_V1–M1_V7 collectively, while this
audience is 100–1000 employees on 2–20 sites. Scope is limited to two import
hooks, and imported invoices post no journal entries. Evidence:
EV_MULTI_008, EV_PRODUCT_007.
6. P_00013 — Production quantity cannot be selected from total economic cost
Canonical priority: 50 · Statement type: market_hypothesis ·
Status: approved
Tuple check: The tuple doesn't contradict the situation. The record's own scope note says the supporting observation came from a single-site manufacturer of finished goods and machined parts, and that selection into any other operating context is an unevidenced hypothesis until tested against the record's situation and observable signals. That test hasn't been recorded for this audience. Ask before leading with this theme.
Hypothesis to test: Can the company run materially different quantities of the same item, and when it chooses a quantity, does its planning process compare per-unit production cost, expected scrap, demand, and inventory carrying cost together?
Listen for:
- The company asks whether it should run a small quantity or tens of thousands of the same item.
- The incumbent offers learning-curve functionality, but the team says it can't make it produce the required decision.
- Per-unit production cost changes materially with run quantity.
- Expected scrap is described as able to change the preferred run quantity.
- Planners need to compare candidate run quantities with demand and the cost of holding excess finished inventory.
Disconfirm when:
- For representative items and work centers, the company keeps a batch-size comparison combining run quantity, per-unit cost, expected scrap, demand, and carrying cost.
- Planning records show selected quantities are routinely evaluated against that comparison, and realized results reconcile within agreed tolerances.
- The company produces only against firm demand, with no material batch-size choice or carrying-cost exposure.
Evidence to request: Completed manufacturing-order history for representative items and work centers (run quantity, material and conversion cost, produced quantity, scrap quantity and cost), the demand and finished-inventory position when each quantity was chosen, the company's carrying-cost method, and each chosen quantity's realized result.
Do not claim: that any quantity is optimal before history, demand, and carrying cost are evaluated; that a larger batch necessarily lowers total economic cost; any quantified saving, scrap reduction, carrying-cost reduction, or return on investment; that AI or a dashboard can identify an optimal quantity without complete, timely data; that the incumbent lacks learning-curve functionality.
Solution — S_00012 Reviewed production-cost comparison by order quantity
(priority 50, approved). Historical manufacturing orders are compared by run
quantity on planned and actual cost, with confirmed demand and current stock
shown as context. Until a customer supplies a carrying-cost method, it's a
production-cost comparison only and doesn't establish total economic cost or a
preferred batch size.
- Native: planned and actual cost on each manufacturing order; confirmed sales-order demand and current stock quantity as context.
- Configured: comparison of historical order cost by run quantity; an expected-scrap assumption; a reviewed comparison before release; a customer-supplied expected-stock and carrying-cost calculation, which is blocked because no method or inputs have been supplied.
- Unavailable: product-native expected-stock valuation and carrying cost. Never present it as shipped, configured, or on the roadmap.
- Limitations: it doesn't calculate the total economic cost
P_00013describes; history may not predict a run after process changes; scrap history isn't expected scrap without a customer method; it doesn't optimize the production queue, select a batch size, or replace planner judgment. - Do not claim: native expected-stock or carrying-cost calculation; that stock quantity is expected stock value; that planned-versus-actual cost is total economic cost; that the lowest historical cost identifies the preferred batch; that a larger or smaller batch necessarily lowers total cost; that a customer calculation exists before it's supplied; that the extension is out of the box or has a known effort; that cost or scrap relationships stay unchanged; automatic selection or release of a quantity; any quantified saving or return.
Proof — PF_MULTI_006 Reconcilable production-cost comparison across
completed run quantities (dataset test, owner COO, approved). At least two
completed orders at materially different quantities, over at least six months
under one unchanged costing strategy, must reconcile to their source orders,
reproduce on recalculation, and be confirmed by a named planner as one input
to a quantity decision. The comparison covers a single item at one work site.
M1_V1 is listed directly, but that listing rests on product-surface
evidence with no vertical scope. The proof has never been executed, and its
account context is a single-site manufacturer of 20–100 employees. Evidence:
EV_PRODUCT_002, EV_PRODUCT_006.
Competitive context
Competitors appear in YAML order. Selection means each profile is relevant context for this audience. It doesn't establish that any account uses or is evaluating the product. Neither product is one of this audience's configured systems of record, so don't treat either as the incumbent. Use competitor-specific language with an account only when account or buyer-confirmed evidence shows it uses or is evaluating that product.
1. C_00002_DELMIAWORKS — DELMIAworks
Profile status: approved, last reviewed 2026-10-13. Ratings as of
2026-10-13: 4.1/5 from 34 G2 reviews; 4.1 from 292 Capterra reviews.
The profile's fit question is whether the buyer needs DELMIAworks' shop-floor depth and can carry the training, implementation effort, and update testing reviewers describe. It advises competing on the buyer's shop-floor workflow and a tested proof, not on interface age or feature count.
- Review-reported strengths: ERP and MES on one database with real-time production visibility; inventory and purchasing control; machine-level data (single reviewers); molding depth (one 2020 G2 reviewer); support (Capterra customer service 4.3); ongoing product development.
- Review-reported limitations: learning curve (seven of ten recent Capterra reviews, 2026); demanding implementation; a dated interface (four of ten recent Capterra reviews); update and fix problems (negative in 65% of 48 mentioning Capterra reviews); report formatting and custom-report cost (G2, 2020–2021); value for money (Capterra 3.8); adapting to non-standard processes (single reviewers). These are reviewer experiences, not universal product behavior; the visible G2 reviews date from 2019–2021.
- Naologic differentiation in the profile: prove fit on one real job; native production reporting that posts to inventory, journal entries, completion, inspections, and OEE; extrusion costing during reporting, including regrind blending; OEE computed from declared production, with machine telemetry unverified; test response time at the buyer's scale; Builder and upgrade paths unverified.
- Audience note: the profile's molding-depth strength and best-fit note
concern injection molding, which the vertical catalog places in
M1_V2, not in this extrusion vertical. The profile's extrusion-specific point is the regrind-aware production-report costing above.
Discovery questions:
- Which shop-floor data do your teams rely on in real time, such as machine signals, cycle times, OEE, or labor reporting? Which comes straight from machines, and which do operators enter?
- How do you plan and test system updates today, and what has an update changed for the people doing the work?
- Which reports do people rebuild in a spreadsheet or pay to customize, and who maintains them?
- Which processes do you run differently from the standard system path, and who makes those changes: your team, the vendor, or a partner?
- How long does a new planner, buyer, or supervisor take to work in the system without help?
- How do planners see future supply and demand by period, and trace a requirement back to the order that created it?
Do not claim: that DELMIAworks is outdated, hard to use, unstable, or a poor fit for every manufacturer, or question its reviews; a general claim from one review, or omitting that the visible G2 reviews date from 2019–2021; that Naologic is faster, easier, cheaper, more modern, easier to upgrade, or free of implementation or consultants without a buyer-specific test; that Naologic captures machine telemetry or connects directly to machines; that OEE from declared production equals machine-measured OEE; responsiveness at any volume or concurrency without a test; a configured, integrated, or roadmap requirement as native.
2. C_00003_ACUMATICA — Acumatica Cloud ERP
Profile status: approved, last reviewed 2026-10-13. Ratings as of
2026-10-13: 4.4/5 from 2,050 G2 reviews; 4.4 from 243 Capterra reviews.
Capterra reports that 54% of its 107 reviewers from the past two years work in
construction.
The profile's fit question is whether the buyer's production and costing work fits the standard product or depends on customizations, add-ons, and partner packages, which reviewers connect to higher total cost. It advises competing on the buyer's job costing and a tested proof, not on ease of use, AI, or price.
- Review-reported strengths: ease of use; customization and flexibility; one system with real-time visibility; integrations and cloud access; construction and distribution depth; recent AI features and release cadence.
- Review-reported limitations: learning curve and setup; missing features (the most-shown G2 con), with specific gaps from 2026 Capterra reviewers including outside processes and outside labor rollup on work orders (one machinery reviewer) and trouble getting to landed cost (two reviewers); high total cost of ownership (negative in 67% of 30 mentioning Capterra reviews); add-on and partner-package friction; reporting and access administration; inconsistency and documentation. The visible Capterra reviews all date from January 28, 2026 and were vendor-referred, few visible reviewers work in manufacturing, and the work-order costing complaint rests on one review.
- Naologic differentiation in the profile: prove fit on one real job; native job cost rebuilt from production reports, work orders, and time tickets, with journal entries for the resulting inventory movements; test recalculation response time at the buyer's volume; treat outside processing, subcontracting, consigned inventory, and landed cost as unverified; don't lead with AI reporting; map and test every integration and add-on.
- Audience note: the profile reports reviewers (2026) describing moves to
Acumatica from QuickBooks, Sage 100 and 300, SAP Business One, Macola,
AS400, and DOS-based systems. QuickBooks and an SAP product overlap with
this audience's configured systems, but the tuple's
sapdoesn't say which SAP product. Reviewer-reported migration history isn't evidence that an account is evaluating Acumatica.
Discovery questions:
- How do outside processing, freight, and duty get into job and item cost today, and how much do you trust the margin numbers that result?
- Which add-ons, partner packages, or integrations does your current setup depend on, and who maintains them when something changes?
- Which reports do people still build by hand or in a spreadsheet, and who maintains them?
- Which processes have you customized, and who makes changes today: your team, a partner, or the vendor?
- How long does a new planner, buyer, or supervisor take to work without help, and which tasks take more steps than they should?
- How do you grant and restrict access when someone's role changes?
Do not claim: that Acumatica is hard to use, expensive, accounting-only, or a poor fit for manufacturers, or question its reviews; a general claim from one review, or omitting that the visible Capterra reviews date from January 28, 2026 and were vendor-referred; Acumatica's implementation length, prices, or add-on requirements as fact; that Naologic is faster, easier, cheaper, quicker to implement, less dependent on add-ons or partners, or better at AI without a buyer-specific test; that Naologic handles outside processing, subcontracting, consigned inventory, landed cost, multi-company accounting, deferred revenue, payroll, or natural-language reporting; responsiveness at any volume or concurrency without a test; a configured, integrated, or roadmap requirement as native.
Audience-specific framing and do not assert
The YAML sets framing: null, so there's no audience-specific lead_with,
outcome_bar, or do_not_assert. Use the canonical boundaries above without
strengthening them.
These canonical prohibitions bear directly on this audience's tuple. Each comes from the record named.
- Don't say an account has any selected problem before it confirms the
situation and evidence. All six problems are
market_hypothesis. - Don't say SAP, or any named ERP, is generally incapable of reporting
(
P_00010). - Don't say the ledger moves off QuickBooks or another incumbent accounting
package, or that a native financial close is available (
S_00002). - Don't say an incumbent vendor locks customers in or prevents data access, or
that unrecovered data is permanently lost (
P_00012,S_00011). - Don't say reported financials are wrong or that any product, line, or site
loses money (
P_00002,S_00002). - Don't say replacing the system makes inventory accurate, or that a variance
proves employee error (
P_00011,S_00010). - Don't say the product calculates expected stock value, carrying cost, or an
optimal batch size, or that it selects or releases a production quantity
(
P_00013,S_00012). - Don't say capacity planning reserves a production slot, automates final
sequencing, or replaces scheduling judgment (
PF_MULTI_002). - Don't say Naologic captures machine telemetry, or that OEE from declared
production equals machine-measured OEE (
C_00002_DELMIAWORKS). - Don't state any quantified saving, recovered margin, labor, accuracy, throughput, or turnaround improvement (every selected problem and solution).
- Don't present a configured, integrated, roadmap, or unavailable capability as native (every selected solution; both competitor profiles).
- Don't say an account uses or is evaluating DELMIAworks or Acumatica without account or buyer-confirmed evidence (competitor index and profiles).
Outstanding before approval or call-sheet generation
W11 is not eligible for this audience. Items 1 and 2 each block it on
their own.
- No market-persona binding for
M1_V1andP3. Nomarket_persona_catalogrecord exists, and the YAML setsmarket_persona: null. Role labels, expected transaction roles, the responsibility hypothesis, and the primary job are unknown. Call-sheet generation requires the persona to have a market-persona binding for the vertical. Resolve throughW3. - No Q&A for any selected problem. All six problems have
confirmation_questions: [], and noqa_catalogrecord exists. Call-sheet generation requires an opening Q&A. Resolve throughW8. P_00010reaches no proof.S_00009hasproofIds: []. Resolve throughW9evidence, thenW7.P_00011reaches no proof usable inM1_V1.PF_M1_V2_001lists onlyM1_V2, its transfer level isprohibited, andM1_V1declares no incoming transfer rule. A separately validatedM1_V1proof is needed.- No selected problem has evidence. Every problem has
evidence_ids: []. They stay usable only as questions. TheP_00013supporting call is still a provisional inbox item. - Most solution capabilities carry no evidence.
S_00002,S_00009,S_00010,S_00011, andS_00012haveevidence_ids: []on every capability;S_00006citesEV_MULTI_007on its four configured capabilities only. Every capability is classified. - The reachable proofs carry caveats.
PF_MULTI_005hasn't been run against an inspected package and doesn't test email or telephone intake.PF_MULTI_006has never been executed and its seven-vertical listing isn't evidenced per vertical.PF_MULTI_007has no measured values. The evidence behindPF_MULTI_006andPF_MULTI_007describes single-site accounts of 20–100 employees, while this audience is 100–1000 employees on 2–20 sites.PF_MULTI_002doesn't cover QuickBooks synchronization. P_00013selection is untested in this context. Its scope note treats selection outside the observed single-site context as an unevidenced hypothesis until the audience tests the record's situation and observable signals.S_00012can't compute total economic cost because expected-stock valuation and carrying cost are unavailable and no customer method has been supplied.- Competitor language isn't executable yet. Both profiles are
approved, but they cite G2 and Capterra pages directly rather than canonical evidence records, and activation still needs account or buyer-confirmed evidence for each account. The competitor index lists both asdraft, which disagrees with their front matter. - Source records disagree with each other.
S_00006callsPF_MULTI_005a draft awaiting lifecycle review, while the proof's YAML saysapproved.PF_MULTI_006notes thatS_00012capability 3 names a sales-order status the product doesn't have; that needs aW13correction.
The empty pre-call predicate, empty rejected signals, and absent discovery and framing overrides are deliberate supported states. They don't block this profile.
Canonical configuration
This profile is enriched from M1_V1-P3-A02.yaml. Edit that file and rerun
enrich-audience; do not edit this profile as the source.
Source records
- Configuration:
M1_V1-P3-A02.yaml(approved) - Catalogs:
markets_catalog.md—M1;market_verticals_catalog.md—M1_V1;persona_list.md—P3;variables.yaml—100_500,500_1000,multi_site_2_20,quickbooks,sap,custom_built - Problems (
approved):P_00002,P_00007,P_00010,P_00011,P_00012,P_00013 - Solutions (
approved):S_00002,S_00006,S_00009,S_00010,S_00011,S_00012 - Proofs (
approved):PF_MULTI_002,PF_MULTI_005,PF_M1_V2_001(not applicable inM1_V1),PF_MULTI_007,PF_MULTI_006 - Evidence (
approved):EV_PRODUCT_002,EV_MULTI_003,EV_MULTI_004,EV_MULTI_007,EV_M1_V2_001,EV_MULTI_008,EV_PRODUCT_007,EV_PRODUCT_006 - Competitors (
approved):C_00002_DELMIAWORKS,C_00003_ACUMATICA